X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696141214000

Well Details

Well ID: 0696141214000
Loading map...
Location: 00/14-12-069-14W6/0
Location Alias: 00/14-12-69-14 W6M
Location Alias 2: 00/14-12-069-14 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 14
Section: 12
County/Municipality: County of Grande Prairie No. 1
Well Name: DAYLIGHT HZ ELM 14-12-69-14
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0417342
License Date: 2010-01-14
License Status: Amended
Spud Date: 2010-11-19
Final Drill Date: 2011-01-04
Well Total Depth: 3797.00 m
Surface Hole Latitude: 54.960040
Surface Hole Longitude: -119.984445

For data sources see[1][2]

Well History

Date Event
2010-01-14 Obtained License
2010-11-23 Surface Casing Operation Performed
2010-12-03 Well Log Performed
2010-12-04 Direction Drilling Operation Performed - Horizontal
2010-12-15 Well Log Performed
2010-12-17 Intermediate Casing Operation Performed
2011-01-04 Finished Drilling
2011-01-04 Well Log Performed
2011-01-04 Well Mode changed to Drilled and Cased
2011-01-05 Well Log Performed
2011-01-08 Production Casing Operation Performed
2011-01-08 Well Log Performed
2011-01-09 Rig Released
2011-01-18 Well Log Performed
2011-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-01-19 Perforation Treatment Performed - Open-Hole Completion
2011-01-24 Perforation Treatment Performed - Jet Perforation
2011-01-24 Well Log Performed
2011-01-25 Perforation Treatment Performed - Fractured
2011-01-25 Perforation Treatment Performed - Jet Perforation
2011-01-26 Perforation Treatment Performed - Fractured
2011-01-26 Well Log Performed
2011-02-01 Well Began Production
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-04 2578.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-19 Open Hole/Barefoot Completion 3792.00 3797.00 0
2011-01-19 Multi-Stage Fracture 3082.70 3082.80 0
2011-01-19 Multi-Stage Fracture 3022.00 3022.10 0
2011-01-24 Perforation 2846.00 2848.00 20
2011-01-25 Fracture 2846.00 2848.00 0
2011-01-25 Perforation 2561.00 2562.00 10
2011-01-25 Perforation 2481.00 2482.00 12
2011-01-25 Perforation 2433.50 2434.50 20
2011-01-26 Fracture 2433.50 2562.00 0
2011-01-19 Multi-Stage Fracture 3754.70 3754.80 0
2011-01-19 Multi-Stage Fracture 3673.60 3673.70 0
2011-01-19 Multi-Stage Fracture 3587.00 3587.10 0
2011-01-19 Multi-Stage Fracture 3498.60 3498.70 0
2011-01-19 Multi-Stage Fracture 3424.10 3424.20 0
2011-01-19 Multi-Stage Fracture 3338.10 3338.20 0
2011-01-19 Multi-Stage Fracture 3253.40 3253.50 0
2011-01-19 Multi-Stage Fracture 3165.90 3166.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7627 0.0 0.0 0.0
2012 7463 0.0 0.0 0.0
2013 7605 0.0 0.0 0.0
2014 8283 0.0 0.0 0.0
2015 8479 0.0 0.0 0.0
2016 7084 0.0 0.0 0.0
2017 8448 0.0 0.0 0.0
2018 7968 0.0 0.0 0.0
2019 7920 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[6]

References