X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696102101000

Well Details

Well ID: 0696102101000
Loading map...
Location: 00/01-21-069-10W6/0
Location Alias: 00/01-21-69-10 W6M
Location Alias 2: 00/01-21-069-10 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 10
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL HZ ELM 1-21-69-10
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0439662
License Date: 2011-11-25
License Status: Suspension
Spud Date: 2011-12-03
Final Drill Date: 2012-01-25
Well Total Depth: 4115.00 m
Surface Hole Latitude: 54.974840
Surface Hole Longitude: -119.438264

For data sources see[1][2]

Well History

Date Event
2011-11-25 Obtained License
2011-12-06 Surface Casing Operation Performed
2011-12-16 Direction Drilling Operation Performed - Horizontal
2011-12-29 Well Log Performed
2011-12-30 Intermediate Casing Operation Performed
2012-01-25 Finished Drilling
2012-01-25 Well Log Performed
2012-01-25 Well Mode changed to Drilled and Cased
2012-01-26 Well Log Performed
2012-01-29 Liner Casing Operation Performed
2012-01-30 Rig Released
2012-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-13 Perforation Treatment Performed - Open-Hole Completion
2012-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-15 Perforation Treatment Performed - Multi-Stage Fracture
2012-02-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-21 Well Began Production
2012-09-21 Well Fluid changed to Gas
2012-09-21 Well Mode changed to Flowing
2019-01-01 Well Fluid changed to Gas
2019-01-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-12-16 2466.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-02-13 Open Hole/Barefoot Completion 4111.00 4115.00 0
2012-02-16 Multi-Stage Fracture 3371.10 3371.20 0
2012-02-16 Multi-Stage Fracture 3281.50 3281.60 0
2012-02-16 Multi-Stage Fracture 3192.30 3192.40 0
2012-02-16 Multi-Stage Fracture 3091.50 3091.60 0
2012-02-13 Multi-Stage Fracture 4099.40 4099.50 0
2012-02-14 Multi-Stage Fracture 4017.80 4017.90 0
2012-02-15 Multi-Stage Fracture 3926.90 3927.00 0
2012-02-15 Multi-Stage Fracture 3837.20 3837.30 0
2012-02-15 Multi-Stage Fracture 3732.50 3732.60 0
2012-02-16 Multi-Stage Fracture 3646.50 3646.60 0
2012-02-16 Multi-Stage Fracture 3559.90 3560.00 0
2012-02-16 Multi-Stage Fracture 3459.00 3459.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 744 0.0 0.0 0.0
2014 6540 0.0 0.0 0.0
2015 8661 0.0 0.0 0.0
2016 3365 0.0 0.0 0.0
2017 2351 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-18 No Incident Encountered 0.00 0.00
2017-10-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References