X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696093005002

Well Details

Well ID: 0696093005002
Loading map...
Location: 00/05-30-069-09W6/2
Location Alias: 00/05-30-69-09 W6M
Location Alias 2: 00/05-30-069-09 W6/02
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 09
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: SINOPEC HZ ELM 5-30-69-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0481895
License Date: 2016-12-14
License Status: Amended
Spud Date: 2017-02-24
Final Drill Date: 2017-03-26
Well Total Depth: 5228.00 m
Surface Hole Latitude: 54.983600
Surface Hole Longitude: -119.346977

For data sources see[1][2]

Well History

Date Event
2016-12-14 Obtained License
2017-02-25 Surface Casing Operation Performed
2017-03-12 Direction Drilling Operation Performed - Horizontal
2017-03-14 Well Log Performed
2017-03-15 Intermediate Casing Operation Performed
2017-03-17 Well Log Performed
2017-03-26 Finished Drilling
2017-03-26 Well Log Performed
2017-03-26 Well Mode changed to Drilled and Cased
2017-03-30 Liner Casing Operation Performed
2017-03-31 Perforation Treatment Performed - Open-Hole Completion
2017-03-31 Rig Released
2017-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-27 Perforation Treatment Performed - Open-Hole Completion
2017-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2017-06-30 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-01 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-02 Perforation Treatment Performed - Multi-Stage Fracture
2017-07-10 Well Began Production
2017-07-10 Well Fluid changed to Gas
2017-07-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-03-12 2401.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-31 Open Hole/Barefoot Completion 5222.00 5228.00 0
2017-06-30 Multi-Stage Fracture 4419.70 4419.80 0
2017-07-01 Multi-Stage Fracture 4318.30 4318.40 0
2017-07-01 Multi-Stage Fracture 4216.90 4217.00 0
2017-07-01 Multi-Stage Fracture 4127.70 4127.80 0
2017-07-01 Multi-Stage Fracture 4026.30 4026.40 0
2017-07-01 Multi-Stage Fracture 3924.90 3925.00 0
2017-07-01 Multi-Stage Fracture 3835.90 3836.00 0
2017-07-01 Multi-Stage Fracture 3734.60 3734.70 0
2017-07-01 Multi-Stage Fracture 3645.50 3645.60 0
2017-07-02 Multi-Stage Fracture 3556.30 3556.40 0
2017-06-27 Open Hole/Barefoot Completion 5222.10 5228.00 0
2017-07-02 Multi-Stage Fracture 3455.30 3455.40 0
2017-07-02 Multi-Stage Fracture 3353.90 3354.00 0
2017-07-02 Multi-Stage Fracture 3265.00 3265.10 0
2017-07-02 Multi-Stage Fracture 3176.00 3176.10 0
2017-07-02 Multi-Stage Fracture 3074.60 3074.70 0
2017-07-02 Multi-Stage Fracture 2985.60 2985.70 0
2017-07-02 Multi-Stage Fracture 2896.30 2896.40 0
2017-06-27 Multi-Stage Fracture 5117.20 5117.30 0
2017-06-28 Multi-Stage Fracture 5015.80 5015.90 0
2017-06-28 Multi-Stage Fracture 4914.40 4914.50 0
2017-06-30 Multi-Stage Fracture 4813.00 4813.10 0
2017-06-30 Multi-Stage Fracture 4711.70 4711.80 0
2017-06-30 Multi-Stage Fracture 4610.30 4610.40 0
2017-06-30 Multi-Stage Fracture 4509.10 4509.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-06-27 2017-07-02 2,787 17,606 N/A
2 2017-06-30 2017-07-02 2,787 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.3702 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 11.0824 N/A
Crystalline silica. quartz 14808-60-7 100 11.0824 N/A
Iron Oxide 1309-37-1 100 11.0824 N/A
Titanium Oxide 13463-67-7 100 11.0824 N/A
Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 2.4103 N/A
Crystalline silica. quartz 14808-60-7 100 2.4103 N/A
Iron Oxide 1309-37-1 100 2.4103 N/A
Titanium Oxide 13463-67-7 100 2.4102 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0088 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0088 N/A
CAN-1912 Clay Stabilizer (HT) Canyon Technical Services Clay Control No hazardous ingredients Not Available 100 0.0652 N/A
CAN-2412 Non-emulsifier Canyon Technical Services Demulsifier 1-Hexanol. 2-ethyl-. manuf. of.
by-products from. distn. residues
68609-68-7 100 0.0412 N/A
Benzenesulfonic acid. dodecyl-.
compd. with 2-aminoethanol (1:1)
26836-07-7 100 0.0412 N/A
Methanol 67-56-1 100 0.0412 N/A
Poly(oxyethelyne. oxypropylene) copolymer. liquids 11/6/9003 100 0.0412 N/A
Water 7732-18-5 100 0.0412 N/A
CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0456 N/A
2 Prime Plus (30/50) Canyon Technical Services No specific ingredients Not Available 100 1.3012 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-06-27 2017-07-02 Surface Water - Runoff 18236

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 3145 0.0 0.0 0.0
2018 7104 0.0 0.0 0.0
2019 7540 0.0 0.0 0.0
2020 1468 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-31 No Incident Encountered 0.00 0.00
2017-07-23 No Incident Encountered 0.00 0.00

For data sources see[9]

References