If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696090202000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.953136,"lon":-119.265663,"icon":""}]} |
Location: 00/02-02-069-09W6/0 | |
Location Alias: 00/02-02-69-09 W6M | |
Location Alias 2: 00/02-02-069-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 09 | |
Section: 02 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SDEL ET AL HZ ELM 2-2-69-9 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0444553 | |
License Date: 2012-02-29 | |
License Status: Issued | |
Spud Date: 2012-03-16 | |
Final Drill Date: 2012-05-02 | |
Well Total Depth: 4661.00 m | |
Surface Hole Latitude: 54.953136 | |
Surface Hole Longitude: -119.265663 |
Date | Event |
---|---|
2012-02-29 | Obtained License |
2012-03-20 | Surface Casing Operation Performed |
2012-03-27 | Well Log Performed |
2012-03-28 | Direction Drilling Operation Performed - Deviate |
2012-04-01 | Intermediate Casing Operation Performed |
2012-04-02 | Well Log Performed |
2012-04-03 | Direction Drilling Operation Performed - Horizontal |
2012-05-02 | Finished Drilling |
2012-05-02 | Well Log Performed |
2012-05-02 | Well Mode changed to Drilled and Cased |
2012-05-05 | Liner Casing Operation Performed |
2012-05-05 | Rig Released |
2012-07-17 | Well Log Performed |
2012-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-23 | Perforation Treatment Performed - Open-Hole Completion |
2012-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-07-30 | Well Log Performed |
2012-08-08 | Well Log Performed |
2012-08-12 | Well Began Production |
2012-08-12 | Well Fluid changed to Gas |
2012-08-12 | Well Mode changed to Flowing |
2018-04-01 | Well Fluid changed to Gas |
2018-04-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-03-16 | Precision Drilling Corporation | 508 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-03-28 | 2505.30 | Deviate (5 - 79 degrees) |
2012-04-03 | 2911.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-07-23 | Open Hole/Barefoot Completion | 4659.50 | 4661.00 | 0 |
2012-07-25 | Multi-Stage Fracture | 3815.50 | 3815.60 | 0 |
2012-07-25 | Multi-Stage Fracture | 3716.50 | 3716.60 | 0 |
2012-07-25 | Multi-Stage Fracture | 3618.10 | 3618.20 | 0 |
2012-07-26 | Multi-Stage Fracture | 3505.90 | 3506.00 | 0 |
2012-07-26 | Multi-Stage Fracture | 3406.40 | 3406.50 | 0 |
2012-07-26 | Multi-Stage Fracture | 3307.30 | 3307.40 | 0 |
2012-07-26 | Multi-Stage Fracture | 3194.60 | 3194.70 | 0 |
2012-07-26 | Multi-Stage Fracture | 3094.00 | 3094.10 | 0 |
2012-07-26 | Multi-Stage Fracture | 2993.70 | 2993.80 | 0 |
2012-07-26 | Multi-Stage Fracture | 2881.90 | 2882.00 | 0 |
2012-07-23 | Multi-Stage Fracture | 4634.70 | 4634.80 | 0 |
2012-07-23 | Multi-Stage Fracture | 4544.70 | 4544.80 | 0 |
2012-07-24 | Multi-Stage Fracture | 4445.70 | 4445.80 | 0 |
2012-07-24 | Multi-Stage Fracture | 4334.40 | 4334.50 | 0 |
2012-07-24 | Multi-Stage Fracture | 4233.80 | 4233.90 | 0 |
2012-07-25 | Multi-Stage Fracture | 4132.80 | 4132.90 | 0 |
2012-07-25 | Multi-Stage Fracture | 4024.80 | 4024.90 | 0 |
2012-07-25 | Multi-Stage Fracture | 3926.60 | 3926.70 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 445 | 0.0 | 0.0 | 0.0 |
2013 | 7168 | 0.0 | 0.0 | 0.0 |
2014 | 8614 | 0.0 | 0.0 | 0.0 |
2015 | 8724 | 0.0 | 0.0 | 0.0 |
2016 | 7111 | 0.0 | 0.0 | 0.0 |
2017 | 6614 | 0.0 | 0.0 | 0.0 |
2018 | 8333 | 0.0 | 0.0 | 0.0 |
2019 | 7153 | 0.0 | 0.0 | 0.0 |
2020 | 1186 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-05-05 | No Incident Encountered | 0.00 | 0.00 |
2012-08-15 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]