X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696090109000

Well Details

Well ID: 0696090109000
Loading map...
Location: 00/09-01-069-09W6/0
Location Alias: 00/09-01-69-09 W6M
Location Alias 2: 00/09-01-069-09 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 09
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL HZ ELM 9-1-69-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0434081
License Date: 2011-06-06
License Status: Amended
Spud Date: 2011-07-03
Final Drill Date: 2011-09-13
Well Total Depth: 4286.00 m
Surface Hole Latitude: 54.953205
Surface Hole Longitude: -119.247496

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-07-03 Well Log Performed
2011-07-07 Surface Casing Operation Performed
2011-07-13 Kick Occurred
2011-07-22 Direction Drilling Operation Performed - Horizontal
2011-08-07 Kick Occurred
2011-08-09 Well Log Performed
2011-08-12 Intermediate Casing Operation Performed
2011-09-13 Finished Drilling
2011-09-13 Well Log Performed
2011-09-13 Well Mode changed to Drilled and Cased
2011-09-14 Well Log Performed
2011-09-18 Liner Casing Operation Performed
2011-09-19 Well Log Performed
2011-09-22 Rig Released
2011-10-05 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-05 Perforation Treatment Performed - Open-Hole Completion
2011-10-06 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-09 Well Log Performed
2011-12-10 Well Began Production
2011-12-10 Well Fluid changed to Gas
2011-12-10 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-07-22 2396.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-05 Open Hole/Barefoot Completion 4283.00 4286.00 0
2011-10-07 Multi-Stage Fracture 3509.30 3510.10 0
2011-10-07 Multi-Stage Fracture 3417.50 3418.30 0
2011-10-07 Multi-Stage Fracture 3311.60 3312.40 0
2011-10-07 Multi-Stage Fracture 3220.60 3221.40 0
2011-10-07 Multi-Stage Fracture 3128.50 3129.30 0
2011-10-08 Multi-Stage Fracture 3051.60 3052.40 0
2011-10-08 Multi-Stage Fracture 2916.70 2917.70 0
2011-10-05 Multi-Stage Fracture 4273.70 4275.00 0
2011-10-05 Multi-Stage Fracture 4174.90 4175.70 0
2011-10-05 Multi-Stage Fracture 4084.10 4084.90 0
2011-10-05 Multi-Stage Fracture 3979.20 3980.00 0
2011-10-06 Multi-Stage Fracture 3901.90 3902.70 0
2011-10-06 Multi-Stage Fracture 3795.60 3796.40 0
2011-10-06 Multi-Stage Fracture 3706.40 3707.20 0
2011-10-06 Multi-Stage Fracture 3601.20 3602.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 744 0.0 0.0 0.0
2012 6548 0.0 0.0 0.0
2013 6900 0.0 0.0 0.0
2014 8635 0.0 0.0 0.0
2015 8714 0.0 0.0 0.0
2016 6816 0.0 0.0 0.0
2017 7317 0.0 0.0 0.0
2018 8208 0.0 0.0 0.0
2019 7815 0.0 0.0 0.0
2020 1207 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-07-13 Kick 1978.00 1978.00
2011-08-07 Kick 2856.00 2856.00

For data sources see[7]

References