X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0696081913020

Well Details

Well ID: 0696081913020
Loading map...
Location: 02/13-19-069-08W6/0
Location Alias: 02/13-19-69-08 W6M
Location Alias 2: 02/13-19-069-08 W6/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 6
Range: 08
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: SINOPEC A ELM 13-19-69-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0494875
License Date: 2019-06-17
License Status: Issued
Spud Date: 2019-06-21
Final Drill Date: 2019-07-08
Well Total Depth: 5873.00 m
Surface Hole Latitude: 54.976364
Surface Hole Longitude: -119.178934

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-06-21 Ensign Drilling Inc. T449 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-06-23 816.20 Deviate (5 - 79 degrees)
2019-07-01 2892.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-07-10 Open Hole/Barefoot Completion 5861.50 5873.00 0
2019-08-27 Multi-Stage Fracture 5421.90 5422.00 0
2019-08-27 Multi-Stage Fracture 5372.10 5372.20 0
2019-08-27 Multi-Stage Fracture 5324.10 5324.20 0
2019-08-27 Multi-Stage Fracture 5276.00 5276.10 0
2019-08-27 Multi-Stage Fracture 5228.00 5228.10 0
2019-08-27 Multi-Stage Fracture 5180.00 5180.10 0
2019-08-27 Multi-Stage Fracture 5120.60 5120.70 0
2019-08-27 Multi-Stage Fracture 5072.60 5072.70 0
2019-08-28 Multi-Stage Fracture 5024.60 5024.70 0
2019-08-28 Multi-Stage Fracture 4965.30 4965.40 0
2019-08-26 Multi-Stage Fracture 5839.60 5839.70 0
2019-08-28 Multi-Stage Fracture 4917.20 4917.30 0
2019-08-28 Multi-Stage Fracture 4869.20 4869.30 0
2019-08-28 Multi-Stage Fracture 4821.30 4821.40 0
2019-08-28 Multi-Stage Fracture 4761.90 4762.00 0
2019-08-28 Multi-Stage Fracture 4713.90 4714.00 0
2019-08-28 Multi-Stage Fracture 4665.90 4666.00 0
2019-08-28 Multi-Stage Fracture 4617.80 4617.90 0
2019-08-28 Multi-Stage Fracture 4558.40 4558.50 0
2019-08-28 Multi-Stage Fracture 4510.50 4510.60 0
2019-08-28 Multi-Stage Fracture 4461.40 4461.50 0
2019-08-26 Multi-Stage Fracture 5780.40 5780.50 0
2019-08-28 Multi-Stage Fracture 4413.30 4413.40 0
2019-08-28 Multi-Stage Fracture 4353.90 4354.00 0
2019-08-28 Multi-Stage Fracture 4305.70 4305.80 0
2019-08-29 Multi-Stage Fracture 4257.70 4257.80 0
2019-08-29 Multi-Stage Fracture 4209.60 4209.70 0
2019-08-29 Multi-Stage Fracture 4150.20 4150.30 0
2019-08-29 Multi-Stage Fracture 4102.20 4102.30 0
2019-08-29 Multi-Stage Fracture 4054.10 4054.20 0
2019-08-29 Multi-Stage Fracture 4006.00 4006.10 0
2019-08-29 Multi-Stage Fracture 3946.50 3946.60 0
2019-08-26 Multi-Stage Fracture 5728.40 5728.50 0
2019-08-29 Multi-Stage Fracture 3898.40 3898.50 0
2019-08-29 Multi-Stage Fracture 3850.30 3850.40 0
2019-08-29 Multi-Stage Fracture 3802.30 3802.40 0
2019-08-29 Multi-Stage Fracture 3742.90 3743.00 0
2019-08-29 Multi-Stage Fracture 3694.80 3694.90 0
2019-08-29 Multi-Stage Fracture 3646.70 3646.80 0
2019-08-29 Multi-Stage Fracture 3598.70 3598.80 0
2019-08-29 Multi-Stage Fracture 3539.20 3539.30 0
2019-08-29 Multi-Stage Fracture 3491.10 3491.20 0
2019-08-29 Multi-Stage Fracture 3442.80 3442.90 0
2019-08-26 Multi-Stage Fracture 5676.30 5676.40 0
2019-08-29 Multi-Stage Fracture 3394.80 3394.90 0
2019-08-29 Multi-Stage Fracture 3335.20 3335.30 0
2019-08-30 Multi-Stage Fracture 3287.10 3287.20 0
2019-08-30 Multi-Stage Fracture 3227.60 3227.70 0
2019-08-30 Multi-Stage Fracture 3168.20 3168.30 0
2019-08-30 Multi-Stage Fracture 3108.90 3109.00 0
2019-08-30 Multi-Stage Fracture 3049.40 3049.50 0
2019-08-30 Multi-Stage Fracture 3001.30 3001.40 0
2019-08-30 Multi-Stage Fracture 2953.30 2953.40 0
2019-08-26 Multi-Stage Fracture 5623.90 5624.00 0
2019-08-27 Multi-Stage Fracture 5572.40 5572.50 0
2019-08-27 Multi-Stage Fracture 5522.30 5522.40 0
2019-08-27 Multi-Stage Fracture 5470.90 5471.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-08-26 2019-08-30 2,766 30,150 N/A
2 2019-08-27 2019-08-30 2,766 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 86.0968 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 11.2531 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 3.2262 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.1197 N/A
Methyl Alcohol 67-56-1 100 0.1197 N/A
SFS-1 (Clay Control) Step Energy Services Clay Control Proprietary Trade Secret 100 1.0045 N/A
Water 7732-18-5 100 1.0045 N/A
SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Anionic Acrylamide 5/8/9003 100 0.5532 N/A
Mineral Oil 8012-95-1 100 0.5532 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.5532 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.5532 N/A
Sodium Acrylate 7446-81-3 100 0.5532 N/A
Water 7732-18-5 100 0.5532 N/A
SNE-8C (Non-Emulsifier) Step Energy Services Surfactant Alkyl Sulfonic Acid 11745 100 0.3718 N/A
Methanol 67-56-1 100 0.3718 N/A
Non-Hazardous Ingredients Not Available 100 0.3718 N/A
2 SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.001 N/A
Cured Acrylic Resin Not Available 100 0.001 N/A
Non-Hazardous Ingredients Not Available 100 0.001 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-08-26 2019-08-30 Surface Water - Runoff 10552
2019-08-27 2019-08-29 Surface Water - Runoff 13462
2019-08-26 2019-08-30 Surface Water - Runoff 5474

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1011 0.0 0.0 0.0
2020 583 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-07-10 No Incident Encountered 0.00 0.00
2019-09-03 No Incident Encountered 0.00 0.00

For data sources see[9]

References