If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0696081913020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.976364,"lon":-119.178934,"icon":""}]} |
Location: 02/13-19-069-08W6/0 | |
Location Alias: 02/13-19-69-08 W6M | |
Location Alias 2: 02/13-19-069-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 6 | |
Range: 08 | |
Section: 19 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SINOPEC A ELM 13-19-69-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0494875 | |
License Date: 2019-06-17 | |
License Status: Issued | |
Spud Date: 2019-06-21 | |
Final Drill Date: 2019-07-08 | |
Well Total Depth: 5873.00 m | |
Surface Hole Latitude: 54.976364 | |
Surface Hole Longitude: -119.178934 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-06-21 | Ensign Drilling Inc. | T449 | Drill To LD |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2019-06-23 | 816.20 | Deviate (5 - 79 degrees) |
2019-07-01 | 2892.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-07-10 | Open Hole/Barefoot Completion | 5861.50 | 5873.00 | 0 |
2019-08-27 | Multi-Stage Fracture | 5421.90 | 5422.00 | 0 |
2019-08-27 | Multi-Stage Fracture | 5372.10 | 5372.20 | 0 |
2019-08-27 | Multi-Stage Fracture | 5324.10 | 5324.20 | 0 |
2019-08-27 | Multi-Stage Fracture | 5276.00 | 5276.10 | 0 |
2019-08-27 | Multi-Stage Fracture | 5228.00 | 5228.10 | 0 |
2019-08-27 | Multi-Stage Fracture | 5180.00 | 5180.10 | 0 |
2019-08-27 | Multi-Stage Fracture | 5120.60 | 5120.70 | 0 |
2019-08-27 | Multi-Stage Fracture | 5072.60 | 5072.70 | 0 |
2019-08-28 | Multi-Stage Fracture | 5024.60 | 5024.70 | 0 |
2019-08-28 | Multi-Stage Fracture | 4965.30 | 4965.40 | 0 |
2019-08-26 | Multi-Stage Fracture | 5839.60 | 5839.70 | 0 |
2019-08-28 | Multi-Stage Fracture | 4917.20 | 4917.30 | 0 |
2019-08-28 | Multi-Stage Fracture | 4869.20 | 4869.30 | 0 |
2019-08-28 | Multi-Stage Fracture | 4821.30 | 4821.40 | 0 |
2019-08-28 | Multi-Stage Fracture | 4761.90 | 4762.00 | 0 |
2019-08-28 | Multi-Stage Fracture | 4713.90 | 4714.00 | 0 |
2019-08-28 | Multi-Stage Fracture | 4665.90 | 4666.00 | 0 |
2019-08-28 | Multi-Stage Fracture | 4617.80 | 4617.90 | 0 |
2019-08-28 | Multi-Stage Fracture | 4558.40 | 4558.50 | 0 |
2019-08-28 | Multi-Stage Fracture | 4510.50 | 4510.60 | 0 |
2019-08-28 | Multi-Stage Fracture | 4461.40 | 4461.50 | 0 |
2019-08-26 | Multi-Stage Fracture | 5780.40 | 5780.50 | 0 |
2019-08-28 | Multi-Stage Fracture | 4413.30 | 4413.40 | 0 |
2019-08-28 | Multi-Stage Fracture | 4353.90 | 4354.00 | 0 |
2019-08-28 | Multi-Stage Fracture | 4305.70 | 4305.80 | 0 |
2019-08-29 | Multi-Stage Fracture | 4257.70 | 4257.80 | 0 |
2019-08-29 | Multi-Stage Fracture | 4209.60 | 4209.70 | 0 |
2019-08-29 | Multi-Stage Fracture | 4150.20 | 4150.30 | 0 |
2019-08-29 | Multi-Stage Fracture | 4102.20 | 4102.30 | 0 |
2019-08-29 | Multi-Stage Fracture | 4054.10 | 4054.20 | 0 |
2019-08-29 | Multi-Stage Fracture | 4006.00 | 4006.10 | 0 |
2019-08-29 | Multi-Stage Fracture | 3946.50 | 3946.60 | 0 |
2019-08-26 | Multi-Stage Fracture | 5728.40 | 5728.50 | 0 |
2019-08-29 | Multi-Stage Fracture | 3898.40 | 3898.50 | 0 |
2019-08-29 | Multi-Stage Fracture | 3850.30 | 3850.40 | 0 |
2019-08-29 | Multi-Stage Fracture | 3802.30 | 3802.40 | 0 |
2019-08-29 | Multi-Stage Fracture | 3742.90 | 3743.00 | 0 |
2019-08-29 | Multi-Stage Fracture | 3694.80 | 3694.90 | 0 |
2019-08-29 | Multi-Stage Fracture | 3646.70 | 3646.80 | 0 |
2019-08-29 | Multi-Stage Fracture | 3598.70 | 3598.80 | 0 |
2019-08-29 | Multi-Stage Fracture | 3539.20 | 3539.30 | 0 |
2019-08-29 | Multi-Stage Fracture | 3491.10 | 3491.20 | 0 |
2019-08-29 | Multi-Stage Fracture | 3442.80 | 3442.90 | 0 |
2019-08-26 | Multi-Stage Fracture | 5676.30 | 5676.40 | 0 |
2019-08-29 | Multi-Stage Fracture | 3394.80 | 3394.90 | 0 |
2019-08-29 | Multi-Stage Fracture | 3335.20 | 3335.30 | 0 |
2019-08-30 | Multi-Stage Fracture | 3287.10 | 3287.20 | 0 |
2019-08-30 | Multi-Stage Fracture | 3227.60 | 3227.70 | 0 |
2019-08-30 | Multi-Stage Fracture | 3168.20 | 3168.30 | 0 |
2019-08-30 | Multi-Stage Fracture | 3108.90 | 3109.00 | 0 |
2019-08-30 | Multi-Stage Fracture | 3049.40 | 3049.50 | 0 |
2019-08-30 | Multi-Stage Fracture | 3001.30 | 3001.40 | 0 |
2019-08-30 | Multi-Stage Fracture | 2953.30 | 2953.40 | 0 |
2019-08-26 | Multi-Stage Fracture | 5623.90 | 5624.00 | 0 |
2019-08-27 | Multi-Stage Fracture | 5572.40 | 5572.50 | 0 |
2019-08-27 | Multi-Stage Fracture | 5522.30 | 5522.40 | 0 |
2019-08-27 | Multi-Stage Fracture | 5470.90 | 5471.00 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-08-26 | 2019-08-30 | 2,766 | 30,150 | N/A |
2 | 2019-08-27 | 2019-08-30 | 2,766 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.0968 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 11.2531 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 3.2262 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.1197 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.1197 | N/A | ||||
SFS-1 (Clay Control) | Step Energy Services | Clay Control | Proprietary | Trade Secret | 100 | 1.0045 | N/A | |
Water | 7732-18-5 | 100 | 1.0045 | N/A | ||||
SFR-110 (Friction Reducer) | Step Energy Services | Friction Reducer | Anionic Acrylamide | 5/8/9003 | 100 | 0.5532 | N/A | |
Mineral Oil | 8012-95-1 | 100 | 0.5532 | N/A | ||||
Primary Alcohol Ethoxylatehigh | 68131-39-5 | 100 | 0.5532 | N/A | ||||
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic | 15214-89-8 | 100 | 0.5532 | N/A | ||||
Sodium Acrylate | 7446-81-3 | 100 | 0.5532 | N/A | ||||
Water | 7732-18-5 | 100 | 0.5532 | N/A | ||||
SNE-8C (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Sulfonic Acid | 11745 | 100 | 0.3718 | N/A | |
Methanol | 67-56-1 | 100 | 0.3718 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.3718 | N/A | ||||
2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.001 | N/A |
Cured Acrylic Resin | Not Available | 100 | 0.001 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.001 | N/A |
For data sources see[6]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-08-26 | 2019-08-30 | Surface Water - Runoff | 10552 |
2019-08-27 | 2019-08-29 | Surface Water - Runoff | 13462 |
2019-08-26 | 2019-08-30 | Surface Water - Runoff | 5474 |
For data sources see[7]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1011 | 0.0 | 0.0 | 0.0 |
2020 | 583 | 0.0 | 0.0 | 0.0 |
For data sources see[8]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-07-10 | No Incident Encountered | 0.00 | 0.00 |
2019-09-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[9]