If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695110212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.946725,"lon":-115.574284,"icon":""}]} |
Location: 00/12-02-069-11W5/0 | |
Location Alias: 00/12-02-69-11 W5M | |
Location Alias 2: 00/12-02-069-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 11 | |
Section: 02 | |
County/Municipality: Big Lakes County | |
Well Name: DOME PROVO SHELL SWANH 12-2-69-11 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0030059 | |
License Date: 1966-02-18 | |
License Status: RecCertified | |
Spud Date: 1966-05-30 | |
Final Drill Date: 1966-06-22 | |
Well Total Depth: 2657.90 m | |
Surface Hole Latitude: 54.946725 | |
Surface Hole Longitude: -115.574284 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1966-02-18 | Obtained License |
1966-06-04 | Drill Stem Test Performed |
1966-06-22 | Finished Drilling |
1966-06-22 | Well Mode changed to Drilled and Cased |
1966-06-24 | Production Casing Operation Performed |
1966-06-25 | Perforation Treatment Performed - Selective Jet Perforations |
1966-06-26 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1966-06-27 | Well Began Production |
1966-06-27 | Well Fluid changed to Crude Oil |
1966-06-27 | Well Mode changed to Flowing |
1967-11-22 | Well Began Injection |
1967-11-22 | Well Fluid changed to Water |
1967-11-22 | Well Type changed to Injection |
1972-07-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1978-10-09 | Perforation Treatment Performed - Cement Plug |
1978-10-09 | Well Abandoned |
1978-10-09 | Well Fluid changed to Water |
1978-10-09 | Well Mode changed to Abandoned |
1978-10-09 | Well Type changed to Injection |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1966-06-25 | Selective Jet Perforations | 2615.80 | 2617.00 | 0 |
1966-06-25 | Selective Jet Perforations | 2620.10 | 2621.90 | 0 |
1966-06-25 | Selective Jet Perforations | 2622.50 | 2623.70 | 0 |
1966-06-25 | Selective Jet Perforations | 2625.20 | 2627.10 | 0 |
1966-06-25 | Selective Jet Perforations | 2628.30 | 2628.30 | 0 |
1966-06-26 | Acid Treatment | 2615.80 | 2628.30 | 0 |
1972-07-24 | Acid Treatment | 2615.80 | 2628.30 | 0 |
1978-10-09 | Cement Plug | 1141.80 | 1176.20 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 4365 | 0.0 | 0.0 | 0.0 |
1968 | 0 | 0.0 | 0.0 | 0.0 |
1969 | 0 | 0.0 | 0.0 | 0.0 |
1970 | 0 | 0.0 | 0.0 | 0.0 |
1971 | 0 | 0.0 | 0.0 | 0.0 |
1972 | 0 | 0.0 | 0.0 | 0.0 |
1973 | 0 | 0.0 | 0.0 | 0.0 |
1974 | 0 | 0.0 | 0.0 | 0.0 |
1975 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]