X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695110114000

Well Details

Well ID: 0695110114000
Loading map...
Location: 00/14-01-069-11W5/0
Location Alias: 00/14-01-69-11 W5M
Location Alias 2: 00/14-01-069-11 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 11
Section: 01
County/Municipality: Big Lakes County
Well Name: ACL HZ SWANH 14-1-69-11
Operator Name: Cardinal Energy Ltd.
License Number: 0460677
License Date: 2013-11-01
License Status: Issued
Spud Date: 2013-11-21
Final Drill Date: 2013-12-08
Well Total Depth: 3594.00 m
Surface Hole Latitude: 54.951057
Surface Hole Longitude: -115.523923

For data sources see[1][2]

Well History

Date Event
2013-11-01 Obtained License
2013-11-24 Surface Casing Operation Performed
2013-11-29 Direction Drilling Operation Performed - Deviate
2013-12-01 Direction Drilling Operation Performed - Horizontal
2013-12-03 Intermediate Casing Operation Performed
2013-12-03 Well Log Performed
2013-12-05 Well Log Performed
2013-12-08 Finished Drilling
2013-12-08 Well Log Performed
2013-12-08 Well Mode changed to Drilled and Cased
2013-12-11 Liner Casing Operation Performed
2013-12-11 Perforation Treatment Performed - Open-Hole Completion
2013-12-12 Rig Released
2013-12-16 Well Log Performed
2013-12-17 Well Log Performed
2013-12-20 Perforation Treatment Performed - Multi-Stage Fracture
2014-02-01 Well Began Production
2014-02-01 Well Fluid changed to Crude Oil
2014-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-21 Akita Drilling Ltd. 35 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-29 2106.10 Deviate (5 - 79 degrees)
2013-12-01 2543.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-12-11 Open Hole/Barefoot Completion 3590.00 3594.00 0
2013-12-20 Multi-Stage Fracture 2943.10 2943.20 0
2013-12-20 Multi-Stage Fracture 2972.30 2972.40 0
2013-12-20 Multi-Stage Fracture 2987.00 2987.10 0
2013-12-20 Multi-Stage Fracture 3014.10 3014.20 0
2013-12-20 Multi-Stage Fracture 3061.20 3061.30 0
2013-12-20 Multi-Stage Fracture 3090.00 3090.10 0
2013-12-20 Multi-Stage Fracture 3104.10 3104.20 0
2013-12-20 Multi-Stage Fracture 3131.70 3131.80 0
2013-12-20 Multi-Stage Fracture 3177.80 3177.90 0
2013-12-20 Multi-Stage Fracture 3192.40 3192.50 0
2013-12-20 Multi-Stage Fracture 2670.30 2670.40 0
2013-12-20 Multi-Stage Fracture 3221.30 3221.40 0
2013-12-20 Multi-Stage Fracture 3235.90 3236.00 0
2013-12-20 Multi-Stage Fracture 3280.90 3281.00 0
2013-12-20 Multi-Stage Fracture 3295.20 3295.30 0
2013-12-20 Multi-Stage Fracture 3309.40 3309.50 0
2013-12-20 Multi-Stage Fracture 3324.00 3324.10 0
2013-12-20 Multi-Stage Fracture 3343.60 3343.70 0
2013-12-20 Multi-Stage Fracture 3358.20 3358.30 0
2013-12-20 Multi-Stage Fracture 3372.80 3372.90 0
2013-12-20 Multi-Stage Fracture 3387.00 3387.10 0
2013-12-20 Multi-Stage Fracture 2699.20 2699.30 0
2013-12-20 Multi-Stage Fracture 3406.70 3406.80 0
2013-12-20 Multi-Stage Fracture 3421.40 3421.50 0
2013-12-20 Multi-Stage Fracture 3436.00 3436.10 0
2013-12-20 Multi-Stage Fracture 3450.60 3450.70 0
2013-12-20 Multi-Stage Fracture 3470.40 3470.50 0
2013-12-20 Multi-Stage Fracture 3484.20 3484.30 0
2013-12-20 Multi-Stage Fracture 3498.80 3498.90 0
2013-12-20 Multi-Stage Fracture 3512.50 3512.60 0
2013-12-20 Multi-Stage Fracture 3567.10 3567.20 0
2013-12-20 Multi-Stage Fracture 2725.40 2725.50 0
2013-12-20 Multi-Stage Fracture 2753.50 2753.60 0
2013-12-20 Multi-Stage Fracture 2815.50 2815.60 0
2013-12-20 Multi-Stage Fracture 2830.10 2830.20 0
2013-12-20 Multi-Stage Fracture 2859.10 2859.20 0
2013-12-20 Multi-Stage Fracture 2884.70 2884.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-12-20 2013-12-20 2,424 1,817 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 ethylbenzene 100-41-4 100 21.064 N/A
hydrochloric acid 7647-01-0 100 64.4479 N/A
methanol 67-56-1 100 6.0944 N/A
water Not Available 100 34.9226 N/A
xylene 1330-20-7 100 21.064 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-12-19 2013-12-19 Municipal Water 155
2014-01-04 2014-01-08 Oilfield Produced Water 78
2013-12-18 2013-12-18 Municipal Water 70
2013-12-18 2013-12-18 Surface Water - Lake 78

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 7071 0.0 0.0 0.0
2015 8357 0.0 0.0 0.0
2016 8775 0.0 0.0 0.0
2017 8731 0.0 0.0 0.0
2018 7862 0.0 0.0 0.0
2019 8374 0.0 0.0 0.0
2020 2138 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-12-12 No Incident Encountered 0.00 0.00
2014-01-12 No Incident Encountered 0.00 0.00

For data sources see[10]

References