If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695103310020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.011649,"lon":-115.459839,"icon":""}]} |
Location: 02/10-33-069-10W5/0 | |
Location Alias: 02/10-33-69-10 W5M | |
Location Alias 2: 02/10-33-069-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 10 | |
Section: 33 | |
County/Municipality: Big Lakes County | |
Well Name: ACL 102 HZ SWANH 10-33-69-10 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0432495 | |
License Date: 2011-03-21 | |
License Status: Issued | |
Spud Date: 2011-05-03 | |
Final Drill Date: 2011-05-22 | |
Well Total Depth: 3042.00 m | |
Surface Hole Latitude: 55.011649 | |
Surface Hole Longitude: -115.459839 |
Date | Event |
---|---|
2011-03-21 | Obtained License |
2011-05-05 | Surface Casing Operation Performed |
2011-05-09 | Well Log Performed |
2011-05-10 | Direction Drilling Operation Performed - Deviate |
2011-05-14 | Direction Drilling Operation Performed - Horizontal |
2011-05-14 | Well Log Performed |
2011-05-19 | Intermediate Casing Operation Performed |
2011-05-20 | Well Log Performed |
2011-05-22 | Finished Drilling |
2011-05-22 | Well Log Performed |
2011-05-22 | Well Mode changed to Drilled and Cased |
2011-05-25 | Liner Casing Operation Performed |
2011-05-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-26 | Perforation Treatment Performed - Open-Hole Completion |
2011-05-26 | Rig Released |
2011-05-29 | Well Log Performed |
2011-06-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2011-06-16 | Well Began Production |
2011-06-16 | Well Fluid changed to Crude Oil |
2011-06-16 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-05-10 | 1954.00 | Deviate (5 - 79 degrees) |
2011-05-14 | 2300.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-05-26 | Open Hole/Barefoot Completion | 3037.00 | 3042.00 | 0 |
2011-05-26 | Multi-Stage Fracture | 2592.50 | 2592.60 | 0 |
2011-05-26 | Multi-Stage Fracture | 2606.70 | 2606.80 | 0 |
2011-05-26 | Multi-Stage Fracture | 2621.20 | 2621.30 | 0 |
2011-05-26 | Multi-Stage Fracture | 2635.60 | 2635.70 | 0 |
2011-05-26 | Multi-Stage Fracture | 2674.00 | 2674.10 | 0 |
2011-05-26 | Multi-Stage Fracture | 2688.60 | 2688.70 | 0 |
2011-05-26 | Multi-Stage Fracture | 2703.30 | 2703.40 | 0 |
2011-05-26 | Multi-Stage Fracture | 2717.90 | 2718.00 | 0 |
2011-05-26 | Multi-Stage Fracture | 2770.80 | 2770.90 | 0 |
2011-05-26 | Multi-Stage Fracture | 2785.30 | 2785.40 | 0 |
2011-05-26 | Multi-Stage Fracture | 2383.70 | 2383.80 | 0 |
2011-05-26 | Multi-Stage Fracture | 2800.00 | 2800.10 | 0 |
2011-05-26 | Multi-Stage Fracture | 2813.60 | 2813.70 | 0 |
2011-05-26 | Multi-Stage Fracture | 2853.70 | 2853.80 | 0 |
2011-05-26 | Multi-Stage Fracture | 2868.30 | 2868.40 | 0 |
2011-05-26 | Multi-Stage Fracture | 2883.00 | 2883.10 | 0 |
2011-05-26 | Multi-Stage Fracture | 2897.70 | 2897.80 | 0 |
2011-05-26 | Multi-Stage Fracture | 2923.40 | 2923.50 | 0 |
2011-05-26 | Multi-Stage Fracture | 2938.10 | 2938.20 | 0 |
2011-05-26 | Multi-Stage Fracture | 2952.70 | 2952.80 | 0 |
2011-05-26 | Multi-Stage Fracture | 2697.40 | 2697.50 | 0 |
2011-05-26 | Multi-Stage Fracture | 2412.90 | 2413.00 | 0 |
2011-05-26 | Multi-Stage Fracture | 3025.40 | 3025.50 | 0 |
2011-06-13 | Acid Treatment | 2383.70 | 3025.50 | 0 |
2011-05-26 | Multi-Stage Fracture | 2427.20 | 2427.30 | 0 |
2011-05-26 | Multi-Stage Fracture | 2456.10 | 2456.20 | 0 |
2011-05-26 | Multi-Stage Fracture | 2510.30 | 2510.40 | 0 |
2011-05-26 | Multi-Stage Fracture | 2524.60 | 2524.70 | 0 |
2011-05-26 | Multi-Stage Fracture | 2538.40 | 2538.50 | 0 |
2011-05-26 | Multi-Stage Fracture | 2553.10 | 2553.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3652 | 0.0 | 0.0 | 0.0 |
2012 | 8377 | 0.0 | 0.0 | 0.0 |
2013 | 8633 | 0.0 | 0.0 | 0.0 |
2014 | 7523 | 0.0 | 0.0 | 0.0 |
2015 | 8338 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8118 | 0.0 | 0.0 | 0.0 |
2018 | 8482 | 0.0 | 0.0 | 0.0 |
2019 | 8481 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[6]