X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695100504000

Well Details

Well ID: 0695100504000
Loading map...
Location: 00/04-05-069-10W5/0
Location Alias: 00/04-05-69-10 W5M
Location Alias 2: 00/04-05-069-10 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 10
Section: 05
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 4-5-69-10
Operator Name: Acquisition Oil Corp.
License Number: 0018162
License Date: 1959-11-20
License Status: Suspension
Spud Date: 1959-11-25
Final Drill Date: 1959-12-18
Well Total Depth: 2514.00 m
Surface Hole Latitude: 54.939683
Surface Hole Longitude: -115.497985

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-11-20 Obtained License
1959-12-18 Finished Drilling
1959-12-18 Well Mode changed to Drilled and Cased
1959-12-20 Production Casing Operation Performed
1960-01-07 Perforation Treatment Performed - Jet Perforation
1960-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-10 Well Began Production
1960-01-10 Well Fluid changed to Crude Oil
1960-01-10 Well Mode changed to Flowing
1963-03-09 Well Fluid changed to Crude Oil
1963-03-09 Well Mode changed to Pumping
1965-09-28 Well Began Injection
1965-09-28 Well Fluid changed to Water
1965-09-28 Well Type changed to Injection
1976-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-16 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-27 Well Fluid changed to Water
2000-03-27 Well Mode changed to Suspended
2000-03-27 Well Type changed to Injection
2008-01-11 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-01-07 Perforation 2474.10 2481.40 7
1960-01-07 Perforation 2485.00 2489.30 7
1960-01-07 Perforation 2498.40 2502.10 7
1960-01-07 Perforation 2506.10 2507.90 7
1960-01-09 Acid Treatment 2474.10 2507.90 0
1976-09-14 Acid Treatment 2474.10 2507.90 0
1976-09-16 Acid Treatment 2474.10 2507.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0

For data sources see[5]

References