X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695092902000

Well Details

Well ID: 0695092902000
Loading map...
Location: 00/02-29-069-09W5/0
Location Alias: 00/02-29-69-09 W5M
Location Alias 2: 00/02-29-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 29
County/Municipality: Big Lakes County
Well Name: ACL ET AL 102 SWAN HILLS 10-29-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0027665
License Date: 1965-02-01
License Status: Suspension
Spud Date: 1965-02-18
Final Drill Date: 1965-03-05
Well Total Depth: 2203.70 m
Surface Hole Latitude: 54.997858
Surface Hole Longitude: -115.332955

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-02-01 Obtained License
1965-03-05 Finished Drilling
1965-03-05 Well Mode changed to Drilled and Cased
1965-03-06 Production Casing Operation Performed
1965-03-09 Perforation Treatment Performed - Bullet Perforation
1965-03-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-03-13 Well Began Production
1965-03-13 Well Fluid changed to Crude Oil
1965-03-13 Well Mode changed to Flowing
1965-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-09-18 Well Fluid changed to Crude Oil
1965-09-18 Well Mode changed to Pumping
1988-09-26 Well Fluid changed to Crude Oil
1988-09-26 Well Mode changed to Suspended
1995-08-01 Well Fluid changed to Crude Oil
1995-08-01 Well Mode changed to Pumping
2000-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-20 Plug Back Performed
2000-09-20 Well Fluid changed to Crude Oil
2000-09-20 Well Log Performed
2000-09-20 Well Mode changed to Abandoned Zone
2000-10-28 Well Fluid changed to Crude Oil
2000-10-28 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-09 Bullet Perforation 2161.90 2163.20 7
1965-03-09 Bullet Perforation 2164.10 2165.90 7
1965-03-09 Bullet Perforation 2166.80 2168.30 7
1965-03-09 Bullet Perforation 2169.00 2170.80 7
1965-03-10 Acid Treatment 2161.90 2170.80 0
1965-03-19 Acid Treatment 2161.90 2170.80 0
2000-09-20 Packing Device Capped w/Cement 2150.00 2158.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 480 0.0 0.0 0.0
1970 3648 0.0 0.0 0.0
1971 6695 0.0 0.0 0.0
1972 1472 0.0 0.0 0.0
1973 478 0.0 0.0 0.0
1974 7144 0.0 0.0 0.0
1975 8235 0.0 0.0 0.0
1976 8530 0.0 0.0 0.0
1977 8637 0.0 0.0 0.0
1978 8219 0.0 0.0 0.0
1979 7271 0.0 0.0 0.0
1982 1464 0.0 0.0 0.0
1983 7759 0.0 0.0 0.0
1984 6545 0.0 0.0 0.0
1985 8651 0.0 0.0 0.0
1986 6355 0.0 0.0 0.0
1995 726 0.0 0.0 0.0

For data sources see[5]

References