X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695092604000

Well Details

Well ID: 0695092604000
Loading map...
Location: 00/04-26-069-09W5/0
Location Alias: 00/04-26-69-09 W5M
Location Alias 2: 00/04-26-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 26
County/Municipality: Big Lakes County
Well Name: ACL SWANH 4-26-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0023841
License Date: 1963-02-19
License Status: Abandoned
Spud Date: 1963-02-24
Final Drill Date: 1963-03-13
Well Total Depth: 2124.80 m
Surface Hole Latitude: 54.997569
Surface Hole Longitude: -115.268934

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-02-19 Obtained License
1963-03-13 Finished Drilling
1963-03-13 Well Mode changed to Drilled and Cased
1963-03-14 Production Casing Operation Performed
1963-06-11 Perforation Treatment Performed - Bullet Perforation
1963-06-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-06-19 Well Began Production
1963-06-19 Well Fluid changed to Crude Oil
1963-06-19 Well Mode changed to Flowing
1966-03-31 Well Began Injection
1966-03-31 Well Fluid changed to Water
1966-03-31 Well Type changed to Injection
1996-03-21 Well Fluid changed to Water
1996-03-21 Well Mode changed to Closed
1996-03-21 Well Type changed to Injection
1996-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-06-10 Well Fluid changed to Water
1996-06-10 Well Type changed to Injection
2005-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-01-28 Perforation Treatment Performed - Cement Squeeze
2012-01-28 Plug Back Performed
2012-01-28 Well Fluid changed to Water
2012-01-28 Well Mode changed to Abandoned Zone
2012-01-28 Well Type changed to Injection
2012-01-29 Perforation Treatment Performed - Jet Perforation
2012-01-30 Perforation Treatment Performed - Remedial Casing
2012-01-31 Perforation Treatment Performed - Jet Perforation
2012-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-01 Perforation Treatment Performed - Jet Perforation
2012-02-01 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2012-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-02 Perforation Treatment Performed - Jet Perforation
2012-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-03 Perforation Treatment Performed - Jet Perforation
2012-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-04 Perforation Treatment Performed - Jet Perforation
2012-02-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-05 Perforation Treatment Performed - Remedial Casing
2012-02-07 Well Abandoned
2012-02-07 Well Fluid changed to Water
2012-02-07 Well Mode changed to Abandoned
2012-02-07 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-06-11 Bullet Perforation 2072.60 2073.90 13
2012-01-29 Perforation 1072.10 1073.10 20
2012-01-30 Remedial Casing Cementing 1072.10 1073.10 0
2012-01-31 Perforation 973.00 974.00 20
2012-01-31 Perforation 984.60 985.60 20
2012-02-01 Packing Dev Cpd w/Res-Gyp Cem 973.50 977.00 0
2012-02-01 Packing Device Capped w/Cement 959.00 967.00 0
2012-02-01 Perforation 731.00 732.00 20
2012-02-01 Perforation 750.00 751.00 20
2012-02-02 Packing Device Capped w/Cement 737.00 745.00 0
2012-02-02 Packing Device Capped w/Cement 719.00 727.00 0
1963-06-11 Bullet Perforation 2076.30 2076.90 13
2012-02-02 Perforation 713.10 714.10 20
2012-02-02 Packing Device Capped w/Cement 699.00 707.00 0
2012-02-02 Perforation 517.90 518.90 20
2012-02-03 Packing Device Capped w/Cement 502.00 510.00 0
2012-02-03 Perforation 423.20 424.20 20
2012-02-04 Packing Device Capped w/Cement 407.00 415.00 0
2012-02-04 Perforation 291.70 292.70 20
2012-02-05 Remedial Casing Cementing 291.70 292.70 0
2012-02-05 Packing Device Capped w/Cement 279.00 289.00 0
1963-06-11 Bullet Perforation 2077.50 2084.50 13
1963-06-11 Bullet Perforation 2088.80 2090.30 13
1963-06-13 Acid Treatment 2072.60 2090.30 0
1996-03-31 Acid Treatment 2072.60 2090.30 0
2005-05-28 Acid Treatment 2072.60 2090.30 0
2012-01-28 Cement Squeeze 2072.60 2090.30 0
2012-01-28 Packing Device Capped w/Cement 1985.00 2020.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0

For data sources see[5]

References