X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695091910000

Well Details

Well ID: 0695091910000
Loading map...
Location: 00/10-19-069-09W5/0
Location Alias: 00/10-19-69-09 W5M
Location Alias 2: 00/10-19-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 19
County/Municipality: Big Lakes County
Well Name: ACL DEERMT 6-19-69-9
Operator Name: Cardinal Energy Ltd.
License Number: 0027314
License Date: 1964-12-10
License Status: Amended
Spud Date: 1964-12-21
Final Drill Date: 1965-01-07
Well Total Depth: 2284.50 m
Surface Hole Latitude: 54.990174
Surface Hole Longitude: -115.358342

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-12-10 Obtained License
1965-01-07 Finished Drilling
1965-01-07 Well Mode changed to Drilled and Cased
1965-01-09 Perforation Treatment Performed - Permeator Perforation
1965-01-09 Production Casing Operation Performed
1965-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-01-30 Well Began Production
1965-01-30 Well Fluid changed to Crude Oil
1965-01-30 Well Mode changed to Pumping
1986-06-30 Well Fluid changed to Crude Oil
1986-06-30 Well Mode changed to Suspended
1994-06-30 Well Fluid changed to Crude Oil
1994-06-30 Well Mode changed to Pumping
1994-07-02 Well Fluid changed to Crude Oil
1994-07-02 Well Mode changed to Pumping
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Suspended
2000-03-19 Well Log Performed
2000-03-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-20 Plug Back Performed
2000-03-20 Well Log Performed
2000-03-27 Well Fluid changed to Crude Oil
2000-03-27 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-01-09 Permeator Perforation 2246.70 2255.50 7
1965-01-09 Permeator Perforation 2256.10 2258.90 7
1965-01-10 Acid Treatment 2246.70 2258.90 0
1965-01-11 Acid Treatment 2246.70 2258.90 0
2000-03-20 Packing Device Capped w/Cement 2232.00 2240.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 240 0.0 0.0 0.0
1968 744 0.0 0.0 0.0
1969 744 0.0 0.0 0.0
1971 2301 0.0 0.0 0.0
1972 4689 0.0 0.0 0.0
1973 672 0.0 0.0 0.0
1974 7325 0.0 0.0 0.0
1975 7572 0.0 0.0 0.0
1976 5845 0.0 0.0 0.0
1977 8421 0.0 0.0 0.0
1978 7983 0.0 0.0 0.0
1979 7973 0.0 0.0 0.0
1980 7623 0.0 0.0 0.0
1981 4998 0.0 0.0 0.0
1982 3872 0.0 0.0 0.0
1983 8460 0.0 0.0 0.0
1984 7035 0.0 0.0 0.0
1985 4002 0.0 0.0 0.0
1986 4201 0.0 0.0 0.0
1994 3019 0.0 0.0 0.0
1995 8293 0.0 0.0 0.0
1996 7862 0.0 0.0 0.0
1997 7856 0.0 0.0 0.0
1998 1161 0.0 0.0 0.0

For data sources see[5]

References