X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0695091612000

Well Details

Well ID: 0695091612000
Loading map...
Location: 00/12-16-069-09W5/0
Location Alias: 00/12-16-69-09 W5M
Location Alias 2: 00/12-16-069-09 W5/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 5
Range: 09
Section: 16
County/Municipality: Big Lakes County
Well Name: LOWRY ET AL SWANH 12-16-69-9
Operator Name: Pine Cliff Energy Ltd.
License Number: 0080729
License Date: 1980-01-29
License Status: RecCertified
Spud Date: 1980-02-09
Final Drill Date: 1980-02-26
Well Total Depth: 2168.00 m
Surface Hole Latitude: 54.976377
Surface Hole Longitude: -115.319069

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-01-29 Obtained License
1980-02-26 Finished Drilling
1980-02-26 Well Mode changed to Drilled and Cased
1980-03-01 Production Casing Operation Performed
1980-03-09 Perforation Treatment Performed - Jet Perforation
1980-03-10 Perforation Treatment Performed - Fractured
1980-03-22 Well Began Production
1980-03-22 Well Fluid changed to Crude Oil
1980-03-22 Well Mode changed to Pumping
1984-07-23 Well Fluid changed to Crude Oil
1984-07-23 Well Mode changed to Suspended
1998-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-31 Plug Back Performed
1998-01-31 Well Fluid changed to Crude Oil
1998-01-31 Well Mode changed to Abandoned Zone
1998-02-01 Well Abandoned
1998-02-01 Well Fluid changed to Crude Oil
1998-02-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-09 Perforation 2155.00 2156.50 6
1980-03-09 Perforation 2149.00 2151.00 6
1980-03-09 Perforation 2144.00 2147.50 6
1980-03-09 Perforation 2138.00 2139.00 6
1980-03-09 Perforation 2141.00 2142.50 6
1980-03-09 Perforation 2134.50 2136.50 6
1980-03-10 Fracture 2134.50 2156.50 0
1998-01-31 Packing Device Capped w/Cement 2114.00 2122.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 1282 0.0 0.0 0.0
1981 2438 0.0 0.0 0.0
1982 3779 0.0 0.0 0.0
1983 4318 0.0 0.0 0.0
1984 2852 0.0 0.0 0.0

For data sources see[5]

References