If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0695090511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.946188,"lon":-115.372624,"icon":""}]} |
Location: 00/11-05-069-09W5/0 | |
Location Alias: 00/11-05-69-09 W5M | |
Location Alias 2: 00/11-05-069-09 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 5 | |
Range: 09 | |
Section: 05 | |
County/Municipality: Big Lakes County | |
Well Name: ACL HZ SWANH 11-5-69-9 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0471506 | |
License Date: 2014-11-17 | |
License Status: Issued | |
Spud Date: 2014-12-03 | |
Final Drill Date: 2014-12-19 | |
Well Total Depth: 4138.00 m | |
Surface Hole Latitude: 54.946188 | |
Surface Hole Longitude: -115.372624 |
Date | Event |
---|---|
2014-11-17 | Obtained License |
2014-12-05 | Surface Casing Operation Performed |
2014-12-09 | Direction Drilling Operation Performed - Deviate |
2014-12-12 | Direction Drilling Operation Performed - Horizontal |
2014-12-12 | Well Log Performed |
2014-12-13 | Intermediate Casing Operation Performed |
2014-12-19 | Finished Drilling |
2014-12-19 | Well Log Performed |
2014-12-19 | Well Mode changed to Drilled and Cased |
2014-12-21 | Liner Casing Operation Performed |
2014-12-21 | Perforation Treatment Performed - Open-Hole Completion |
2014-12-22 | Rig Released |
2015-08-17 | Well Log Performed |
2015-08-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-08-27 | Well Began Production |
2015-08-27 | Well Fluid changed to Crude Oil |
2015-08-27 | Well Mode changed to Flowing |
2015-09-16 | Well Fluid changed to Crude Oil |
2015-09-16 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-12-03 | Horizon Drilling Inc. | 25 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-12-09 | 2009.00 | Deviate (5 - 79 degrees) |
2014-12-12 | 2395.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-12-21 | Open Hole/Barefoot Completion | 4133.00 | 4138.00 | 0 |
2015-08-24 | Multi-Stage Fracture | 3282.30 | 3282.40 | 0 |
2015-08-24 | Multi-Stage Fracture | 3190.00 | 3190.10 | 0 |
2015-08-24 | Multi-Stage Fracture | 3085.00 | 3085.10 | 0 |
2015-08-25 | Multi-Stage Fracture | 2980.00 | 2980.10 | 0 |
2015-08-25 | Multi-Stage Fracture | 2887.90 | 2888.00 | 0 |
2015-08-25 | Multi-Stage Fracture | 2783.30 | 2783.40 | 0 |
2015-08-25 | Multi-Stage Fracture | 2690.90 | 2691.00 | 0 |
2015-08-25 | Multi-Stage Fracture | 2586.10 | 2586.20 | 0 |
2015-08-25 | Multi-Stage Fracture | 2481.60 | 2481.70 | 0 |
2015-08-24 | Multi-Stage Fracture | 4087.20 | 4087.30 | 0 |
2015-08-24 | Multi-Stage Fracture | 3978.10 | 3978.20 | 0 |
2015-08-24 | Multi-Stage Fracture | 3884.40 | 3884.50 | 0 |
2015-08-24 | Multi-Stage Fracture | 3792.00 | 3792.10 | 0 |
2015-08-24 | Multi-Stage Fracture | 3688.00 | 3688.10 | 0 |
2015-08-24 | Multi-Stage Fracture | 3583.80 | 3583.90 | 0 |
2015-08-24 | Multi-Stage Fracture | 3491.40 | 3491.50 | 0 |
2015-08-24 | Multi-Stage Fracture | 3387.00 | 3387.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-08-24 | 2015-08-25 | 2,287 | 4,231 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 88.3713 | N/A | |||
FRAC SAND. 40/70 WHITE | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.6757 | N/A | ||
FRAC SAND.70/140 OR 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 0.355 | N/A | ||
Hydrochloric Acid 15% | Baker Hughes | Acid | Hydrochloric acid | 7647-01-0 | 100 | 5.1174 | N/A | |
Water | 7732-18-5 | 100 | 5.1174 | N/A | ||||
2K7 Solution W-M | Baker Hughes | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0415 | N/A | |
Methanol | 67-56-1 | 100 | 0.0415 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0415 | N/A | ||||
Breaker N | Baker Hughes | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.002 | N/A | |
Nowferr 12 | Baker Hughes | Corrosion Inhibitor | Methanol | 67-56-1 | 100 | 0.019 | N/A | |
Non-hazardous | Not Available | 100 | 0.019 | N/A | ||||
Potassium iodide | 7681-11-0 | 100 | 0.019 | N/A | ||||
Nowferr 3G | Baker Hughes | Corrosion Inhibitor | 2-Propyn-1-ol. compd w methyloxirane | 38172-91-7 | 100 | 0.0239 | N/A | |
Non-hazardous | Not Available | 100 | 0.0239 | N/A | ||||
Propargyl alcohol | 107-19-7 | 100 | 0.0239 | N/A | ||||
FP-12L | Baker Hughes | Defoamer | Non-hazardous | Not Available | 100 | 0.0004 | N/A | |
Octamethylcyclotetrasiloxane | 556-67-2 | 100 | 0.0005 | N/A | ||||
AS-330 | Baker Hughes | Demulsifier | Alkyl benzene sulphonic acid | 27176-87-0 | 100 | 0.0753 | N/A | |
Methanol | 67-56-1 | 100 | 0.0753 | N/A | ||||
Sulphonic acid. alkyl aryl derivative | 147732-59-0 | 100 | 0.0753 | N/A | ||||
Sulphuric acid | 7664-93-9 | 100 | 0.0753 | N/A | ||||
Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 2.1497 | N/A | |
MaxPerm-20A | Baker Hughes | Friction Reducer | Non-hazardous | 9014 | 100 | 0.1335 | N/A | |
Oxyalkylated alcohol | 9014 | 100 | 0.1335 | N/A | ||||
Petroleum distillates | 64742-47-8 | 100 | 0.1335 | N/A | ||||
Polyacrylate | 9014 | 100 | 0.1335 | N/A | ||||
Nowferr 1 | Baker Hughes | Iron Control | Sodium hypophosphite | 10039-56-2 | 100 | 0.0286 | N/A | |
Nowferr 14P | Baker Hughes | Iron Control | Cupric sulphate. pentahydrate | 7758-99-8 | 100 | 0.0059 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-08-24 | 2015-08-25 | Surface Water - Lake | 2178 |
2015-08-24 | 2015-08-25 | Surface Water - Lake | 3811 |
2015-08-24 | 2015-08-25 | Municipal Water | 356 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 2672 | 0.0 | 0.0 | 0.0 |
2016 | 8240 | 0.0 | 0.0 | 0.0 |
2017 | 7666 | 0.0 | 0.0 | 0.0 |
2018 | 8666 | 0.0 | 0.0 | 0.0 |
2019 | 7658 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-12-22 | No Incident Encountered | 0.00 | 0.00 |
2015-09-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]