If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0694040612005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.945426,"lon":-110.612995,"icon":""}]} |
Location: 00/12-06-069-04W4/5 | |
Location Alias: 00/12-06-69-04 W4M | |
Location Alias 2: 00/12-06-069-04 W4/05 | |
Country: Canada | |
Province: Alberta | |
Township: 069 | |
Meridian: 4 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Improvement District No. 349 | |
Well Name: HUSKY FISHER 12-6-69-4 | |
Operator Name: Husky Oil Operations Limited | |
License Number: 0386992 | |
License Date: 2007-12-06 | |
License Status: RecCertified | |
Spud Date: 2008-01-12 | |
Final Drill Date: 2008-01-23 | |
Well Total Depth: 603.00 m | |
Surface Hole Latitude: 54.945426 | |
Surface Hole Longitude: -110.612995 |
Date | Event |
---|---|
2007-12-06 | Obtained License |
2008-01-14 | Surface Casing Operation Performed |
2008-01-23 | Finished Drilling |
2008-01-23 | Production Casing Operation Performed |
2008-01-23 | Well Log Performed |
2008-01-23 | Well Mode changed to Drilled and Cased |
2008-01-24 | Rig Released |
2011-01-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-01-30 | Perforation Treatment Performed - Fractured |
2011-01-30 | Perforation Treatment Performed - Jet Perforation |
2011-01-30 | Plug Back Performed |
2011-01-30 | Well Log Performed |
2011-01-31 | Perforation Treatment Performed - Fractured |
2011-01-31 | Perforation Treatment Performed - Jet Perforation |
2011-01-31 | Well Log Performed |
2011-02-04 | Well Log Performed |
2011-02-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-05 | Perforation Treatment Performed - Cement Squeeze |
2011-02-05 | Perforation Treatment Performed - Fractured |
2011-02-05 | Perforation Treatment Performed - Jet Perforation |
2011-02-05 | Plug Back Performed |
2011-02-05 | Well Log Performed |
2011-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2011-02-06 | Plug Back Performed |
2011-02-07 | Perforation Treatment Performed - Cement Squeeze |
2011-02-07 | Plug Back Performed |
2011-02-07 | Well Mode changed to Abandoned Zone |
2011-03-14 | Well Abandoned |
2011-03-14 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-30 | Packing Device Capped w/Cement | 460.00 | 468.00 | 0 |
2011-02-05 | Fracture | 195.00 | 195.50 | 0 |
2011-02-05 | Cement Squeeze | 335.00 | 335.50 | 0 |
2011-02-05 | Packing Device Capped w/Cement | 258.80 | 450.00 | 0 |
2011-02-05 | Perforation | 247.00 | 247.50 | 17 |
2011-02-06 | Packing Device Capped w/Cement | 11.00 | 240.00 | 0 |
2011-02-07 | Cement Squeeze | 195.00 | 195.50 | 0 |
2011-01-30 | Fracture | 470.00 | 470.50 | 0 |
2011-01-30 | Perforation | 470.00 | 475.50 | 17 |
2011-01-31 | Perforation | 335.00 | 335.50 | 17 |
2011-01-31 | Fracture | 335.00 | 335.50 | 0 |
2011-01-31 | Fracture | 455.00 | 455.50 | 0 |
2011-01-31 | Perforation | 455.00 | 455.50 | 17 |
2011-02-05 | Fracture | 247.00 | 247.50 | 0 |
2011-02-05 | Perforation | 195.00 | 195.50 | 17 |
For data sources see[4]