X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0694031411000

Well Details

Well ID: 0694031411000
Loading map...
Location: 00/11-14-069-03W4/0
Location Alias: 00/11-14-69-03 W4M
Location Alias 2: 00/11-14-069-03 W4/00
Country: Canada
Province: Alberta
Township: 069
Meridian: 4
Range: 03
Section: 14
County/Municipality: Improvement District No. 349
Well Name: CVE FISHER 11-14-69-3
Operator Name: Cenovus Energy Inc.
License Number: 0209260
License Date: 1997-11-25
License Status: Abandoned
Spud Date: 1998-01-24
Final Drill Date: 1998-01-28
Well Total Depth: 637.00 m
Surface Hole Latitude: 54.975244
Surface Hole Longitude: -110.354198

For data sources see[1][2]

Well History

Date Event
1997-11-25 Obtained License
1998-01-26 Surface Casing Operation Performed
1998-01-28 Finished Drilling
1998-01-28 Well Log Performed
1998-01-28 Well Mode changed to Drilled and Cased
1998-01-29 Production Casing Operation Performed
1998-01-29 Rig Released
1998-02-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-02-03 Perforation Treatment Performed - Jet Perforation
1998-02-03 Plug Back Performed
1998-02-03 Well Log Performed
1998-02-03 Well Mode changed to Abandoned Zone
2002-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-03 Perforation Treatment Performed - Jet Perforation
2002-03-03 Well Log Performed
2003-03-05 Well Log Performed
2004-02-25 Perforation Treatment Performed - Cement Plug
2004-02-25 Perforation Treatment Performed - Cement Squeeze
2004-03-03 Perforation Treatment Performed - Jet Perforation
2004-03-03 Well Log Performed
2009-01-31 Perforation Treatment Performed - Jet Perforation
2009-03-16 Perforation Treatment Performed - Cement Plug
2009-03-16 Perforation Treatment Performed - Cement Squeeze
2009-03-16 Plug Back Performed
2009-03-20 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-02-03 Perforation 503.00 505.00 13
2009-01-31 Perforation 503.00 505.00 13
2009-03-16 Cement Squeeze 503.00 505.00 0
2009-03-16 Cement Squeeze 381.00 383.00 0
2009-03-16 Cement Plug 130.00 637.00 0
1998-02-03 Packing Device Capped w/Cement 496.00 500.00 0
1998-02-03 Perforation 381.00 383.00 13
2002-03-03 Packing Device Capped w/Cement 487.00 495.00 0
2002-03-03 Perforation 387.00 388.00 13
2004-02-25 Cement Squeeze 381.00 383.00 0
2004-02-25 Cement Squeeze 387.00 388.00 0
2004-02-25 Cement Plug 386.00 487.00 0
2004-03-03 Perforation 381.00 383.00 20

For data sources see[4]



References