X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686102413000

Well Details

Well ID: 0686102413000
Loading map...
Location: 00/13-24-068-10W6/0
Location Alias: 00/13-24-68-10 W6M
Location Alias 2: 00/13-24-068-10 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 10
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: LONG RUN ELM 13-24-68-10
Operator Name: Long Run Exploration Ltd.
License Number: 0443524
License Date: 2012-01-30
License Status: Issued
Spud Date: 2012-02-12
Final Drill Date: 2012-02-22
Well Total Depth: 2295.00 m
Surface Hole Latitude: 54.908975
Surface Hole Longitude: -119.373740

For data sources see[1][2]

Well History

Date Event
2012-01-30 Obtained License
2012-02-13 Surface Casing Operation Performed
2012-02-14 Direction Drilling Operation Performed - Deviate
2012-02-15 Direction Drilling Operation Performed - Horizontal
2012-02-22 Finished Drilling
2012-02-22 Well Mode changed to Drilled and Cased
2012-02-24 Production Casing Operation Performed
2012-02-24 Rig Released
2012-03-05 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-03-08 Well Began Production
2012-03-08 Well Fluid changed to Gas
2012-03-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-02-12 Champion Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-02-14 247.00 Deviate (5 - 79 degrees)
2012-02-15 1163.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-03-05 Multi-Stage Fracture 2221.30 2221.40 0
2012-03-06 Multi-Stage Fracture 1180.60 1180.70 0
2012-03-05 Multi-Stage Fracture 2122.10 2122.20 0
2012-03-05 Multi-Stage Fracture 2003.20 2003.30 0
2012-03-05 Multi-Stage Fracture 1885.40 1885.50 0
2012-03-05 Multi-Stage Fracture 1779.20 1779.30 0
2012-03-06 Multi-Stage Fracture 1660.80 1660.90 0
2012-03-06 Multi-Stage Fracture 1543.30 1543.40 0
2012-03-06 Multi-Stage Fracture 1425.30 1425.40 0
2012-03-06 Multi-Stage Fracture 1306.40 1306.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 6336 0.0 0.0 0.0
2013 8159 0.0 0.0 0.0
2014 8262 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 5831 0.0 0.0 0.0
2018 4572 0.0 0.0 0.0
2019 7996 0.0 0.0 0.0
2020 2133 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-02-24 No Incident Encountered 0.00 0.00
2012-03-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References