X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686083214000

Well Details

Well ID: 0686083214000
Loading map...
Location: 00/14-32-068-08W6/0
Location Alias: 00/14-32-68-08 W6M
Location Alias 2: 00/14-32-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 32
County/Municipality: Municipal District of Greenview No. 16
Well Name: SINOPEC ELM 14-32-68-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0493839
License Date: 2019-02-22
License Status: Issued
Spud Date: 2019-03-18
Final Drill Date: 2019-04-06
Well Total Depth: 5302.00 m
Surface Hole Latitude: 54.951664
Surface Hole Longitude: -119.217669

For data sources see[1][2]

Well History

Date Event
2019-02-22 Obtained License
2019-03-19 Surface Casing Operation Performed
2019-03-20 Direction Drilling Operation Performed - Deviate
2019-03-27 Intermediate Casing Operation Performed
2019-03-28 Direction Drilling Operation Performed - Horizontal
2019-03-28 Well Log Performed
2019-04-06 Finished Drilling
2019-04-06 Well Log Performed
2019-04-06 Well Mode changed to Drilled and Cased
2019-04-07 Well Log Performed
2019-04-08 Liner Casing Operation Performed
2019-04-09 Perforation Treatment Performed - Open-Hole Completion
2019-04-09 Rig Released
2019-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2019-10-19 Well Fluid changed to Gas
2019-10-19 Well Mode changed to Testing
2019-10-23 Well Began Production
2019-10-23 Well Fluid changed to Gas
2019-10-23 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-03-18 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-03-20 680.30 Deviate (5 - 79 degrees)
2019-03-28 2827.30 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-04-09 Open Hole/Barefoot Completion 5299.00 5302.00 0
2019-07-25 Multi-Stage Fracture 4750.60 4750.70 0
2019-07-25 Multi-Stage Fracture 4691.50 4691.60 0
2019-07-25 Multi-Stage Fracture 4632.30 4632.40 0
2019-07-25 Multi-Stage Fracture 4573.00 4573.10 0
2019-07-25 Multi-Stage Fracture 4513.70 4513.80 0
2019-07-25 Multi-Stage Fracture 4455.90 4456.00 0
2019-07-25 Multi-Stage Fracture 4397.60 4397.70 0
2019-07-25 Multi-Stage Fracture 4342.80 4342.90 0
2019-08-13 Multi-Stage Fracture 3178.20 3178.30 0
2019-08-13 Multi-Stage Fracture 3134.40 3134.50 0
2019-07-24 Multi-Stage Fracture 5212.20 5212.30 0
2019-08-13 Multi-Stage Fracture 3089.50 3089.60 0
2019-08-13 Multi-Stage Fracture 3048.40 3048.50 0
2019-08-13 Multi-Stage Fracture 3004.90 3005.00 0
2019-08-13 Multi-Stage Fracture 2960.80 2960.90 0
2019-08-13 Multi-Stage Fracture 2915.40 2915.50 0
2019-08-13 Multi-Stage Fracture 2871.20 2871.30 0
2019-07-24 Multi-Stage Fracture 5153.40 5153.50 0
2019-07-24 Multi-Stage Fracture 5094.20 5094.30 0
2019-07-24 Multi-Stage Fracture 5035.50 5035.60 0
2019-07-25 Multi-Stage Fracture 4976.70 4976.80 0
2019-07-25 Multi-Stage Fracture 4923.20 4923.30 0
2019-07-25 Multi-Stage Fracture 4864.10 4864.20 0
2019-07-25 Multi-Stage Fracture 4808.60 4808.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-07-24 2019-08-13 2,699 11,752 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.6085 N/A
30/50 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 9.6684 N/A
40/70 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 1.9336 N/A
Secure BIO-10B (Biocide) Step Energy Services Bactericide/Biocide 2-bromo-2-nitro.3-diol 52-51-7 100 0.0089 N/A
Methyl Alcohol 67-56-1 100 0.0089 N/A
SCBO-2 (Breaker) Step Energy Services Breaker Ammonium Persulfate 7727-54-0 100 0.0033 N/A
Cured Acrylic Resin Not Available 100 0.0033 N/A
Non-Hazardous Ingredients Not Available 100 0.0033 N/A
SFS-1 (Clay Control) Step Energy Services Clay Control Proprietary Trade Secret 100 0.1191 N/A
Water 7732-18-5 100 0.1191 N/A
SFR-110 (Friction Reducer) Step Energy Services Friction Reducer Anionic Acrylamide 5/8/9003 100 0.0996 N/A
Mineral Oil 8012-95-1 100 0.0996 N/A
Primary Alcohol Ethoxylatehigh 68131-39-5 100 0.0996 N/A
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic 15214-89-8 100 0.0996 N/A
Sodium Acrylate 7446-81-3 100 0.0996 N/A
Water 7732-18-5 100 0.0996 N/A
SNE-8C (Non-Emulsifier) Step Energy Services Surfactant Alkyl Sulfonic Acid 11745 100 0.0435 N/A
Methanol 67-56-1 100 0.0435 N/A
Non-Hazardous Ingredients Not Available 100 0.0435 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-07-20 2019-07-29 Surface Water - Runoff 6158
2019-08-12 2019-08-13 Surface Water - Runoff 2093
2019-07-27 2019-07-31 Surface Water - Runoff 529
2019-08-13 2019-08-23 Surface Water - Runoff 3879

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 1528 0.0 0.0 0.0
2020 1863 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-09 No Incident Encountered 0.00 0.00
2019-08-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References