If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686083214000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.951664,"lon":-119.217669,"icon":""}]} |
Location: 00/14-32-068-08W6/0 | |
Location Alias: 00/14-32-68-08 W6M | |
Location Alias 2: 00/14-32-068-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 32 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SINOPEC ELM 14-32-68-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0493839 | |
License Date: 2019-02-22 | |
License Status: Issued | |
Spud Date: 2019-03-18 | |
Final Drill Date: 2019-04-06 | |
Well Total Depth: 5302.00 m | |
Surface Hole Latitude: 54.951664 | |
Surface Hole Longitude: -119.217669 |
Date | Event |
---|---|
2019-02-22 | Obtained License |
2019-03-19 | Surface Casing Operation Performed |
2019-03-20 | Direction Drilling Operation Performed - Deviate |
2019-03-27 | Intermediate Casing Operation Performed |
2019-03-28 | Direction Drilling Operation Performed - Horizontal |
2019-03-28 | Well Log Performed |
2019-04-06 | Finished Drilling |
2019-04-06 | Well Log Performed |
2019-04-06 | Well Mode changed to Drilled and Cased |
2019-04-07 | Well Log Performed |
2019-04-08 | Liner Casing Operation Performed |
2019-04-09 | Perforation Treatment Performed - Open-Hole Completion |
2019-04-09 | Rig Released |
2019-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-08-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-19 | Well Fluid changed to Gas |
2019-10-19 | Well Mode changed to Testing |
2019-10-23 | Well Began Production |
2019-10-23 | Well Fluid changed to Gas |
2019-10-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-03-18 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-03-20 | 680.30 | Deviate (5 - 79 degrees) |
2019-03-28 | 2827.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-04-09 | Open Hole/Barefoot Completion | 5299.00 | 5302.00 | 0 |
2019-07-25 | Multi-Stage Fracture | 4750.60 | 4750.70 | 0 |
2019-07-25 | Multi-Stage Fracture | 4691.50 | 4691.60 | 0 |
2019-07-25 | Multi-Stage Fracture | 4632.30 | 4632.40 | 0 |
2019-07-25 | Multi-Stage Fracture | 4573.00 | 4573.10 | 0 |
2019-07-25 | Multi-Stage Fracture | 4513.70 | 4513.80 | 0 |
2019-07-25 | Multi-Stage Fracture | 4455.90 | 4456.00 | 0 |
2019-07-25 | Multi-Stage Fracture | 4397.60 | 4397.70 | 0 |
2019-07-25 | Multi-Stage Fracture | 4342.80 | 4342.90 | 0 |
2019-08-13 | Multi-Stage Fracture | 3178.20 | 3178.30 | 0 |
2019-08-13 | Multi-Stage Fracture | 3134.40 | 3134.50 | 0 |
2019-07-24 | Multi-Stage Fracture | 5212.20 | 5212.30 | 0 |
2019-08-13 | Multi-Stage Fracture | 3089.50 | 3089.60 | 0 |
2019-08-13 | Multi-Stage Fracture | 3048.40 | 3048.50 | 0 |
2019-08-13 | Multi-Stage Fracture | 3004.90 | 3005.00 | 0 |
2019-08-13 | Multi-Stage Fracture | 2960.80 | 2960.90 | 0 |
2019-08-13 | Multi-Stage Fracture | 2915.40 | 2915.50 | 0 |
2019-08-13 | Multi-Stage Fracture | 2871.20 | 2871.30 | 0 |
2019-07-24 | Multi-Stage Fracture | 5153.40 | 5153.50 | 0 |
2019-07-24 | Multi-Stage Fracture | 5094.20 | 5094.30 | 0 |
2019-07-24 | Multi-Stage Fracture | 5035.50 | 5035.60 | 0 |
2019-07-25 | Multi-Stage Fracture | 4976.70 | 4976.80 | 0 |
2019-07-25 | Multi-Stage Fracture | 4923.20 | 4923.30 | 0 |
2019-07-25 | Multi-Stage Fracture | 4864.10 | 4864.20 | 0 |
2019-07-25 | Multi-Stage Fracture | 4808.60 | 4808.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-24 | 2019-08-13 | 2,699 | 11,752 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 88.6085 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 9.6684 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 1.9336 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0089 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0089 | N/A | ||||
SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0033 | N/A | |
Cured Acrylic Resin | Not Available | 100 | 0.0033 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0033 | N/A | ||||
SFS-1 (Clay Control) | Step Energy Services | Clay Control | Proprietary | Trade Secret | 100 | 0.1191 | N/A | |
Water | 7732-18-5 | 100 | 0.1191 | N/A | ||||
SFR-110 (Friction Reducer) | Step Energy Services | Friction Reducer | Anionic Acrylamide | 5/8/9003 | 100 | 0.0996 | N/A | |
Mineral Oil | 8012-95-1 | 100 | 0.0996 | N/A | ||||
Primary Alcohol Ethoxylatehigh | 68131-39-5 | 100 | 0.0996 | N/A | ||||
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic | 15214-89-8 | 100 | 0.0996 | N/A | ||||
Sodium Acrylate | 7446-81-3 | 100 | 0.0996 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0996 | N/A | ||||
SNE-8C (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Sulfonic Acid | 11745 | 100 | 0.0435 | N/A | |
Methanol | 67-56-1 | 100 | 0.0435 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0435 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-20 | 2019-07-29 | Surface Water - Runoff | 6158 |
2019-08-12 | 2019-08-13 | Surface Water - Runoff | 2093 |
2019-07-27 | 2019-07-31 | Surface Water - Runoff | 529 |
2019-08-13 | 2019-08-23 | Surface Water - Runoff | 3879 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1528 | 0.0 | 0.0 | 0.0 |
2020 | 1863 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-04-09 | No Incident Encountered | 0.00 | 0.00 |
2019-08-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]