If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686083212000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.951664,"lon":-119.217982,"icon":""}]} |
Location: 00/12-32-068-08W6/0 | |
Location Alias: 00/12-32-68-08 W6M | |
Location Alias 2: 00/12-32-068-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 32 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: SINOPEC A ELM 12-32-68-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0493680 | |
License Date: 2019-02-04 | |
License Status: Issued | |
Spud Date: 2019-02-17 | |
Final Drill Date: 2019-03-13 | |
Well Total Depth: 5268.70 m | |
Surface Hole Latitude: 54.951664 | |
Surface Hole Longitude: -119.217982 |
Date | Event |
---|---|
2019-02-04 | Obtained License |
2019-02-18 | Surface Casing Operation Performed |
2019-02-23 | Direction Drilling Operation Performed - Deviate |
2019-02-26 | Intermediate Casing Operation Performed |
2019-02-28 | Direction Drilling Operation Performed - Horizontal |
2019-03-01 | Well Log Performed |
2019-03-13 | Finished Drilling |
2019-03-13 | Well Log Performed |
2019-03-13 | Well Mode changed to Drilled and Cased |
2019-03-15 | Liner Casing Operation Performed |
2019-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2019-03-16 | Rig Released |
2019-07-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-07-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-21 | Well Fluid changed to Gas |
2019-10-21 | Well Mode changed to Testing |
2019-10-24 | Well Began Production |
2019-10-24 | Well Fluid changed to Gas |
2019-10-24 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-02-17 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-02-23 | 2458.00 | Deviate (5 - 79 degrees) |
2019-02-28 | 2875.20 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-03-16 | Open Hole/Barefoot Completion | 5263.00 | 5268.00 | 0 |
2019-07-20 | Multi-Stage Fracture | 4756.60 | 4756.70 | 0 |
2019-07-20 | Multi-Stage Fracture | 4700.40 | 4700.50 | 0 |
2019-07-20 | Multi-Stage Fracture | 4647.80 | 4647.90 | 0 |
2019-07-20 | Multi-Stage Fracture | 4542.10 | 4542.20 | 0 |
2019-07-20 | Multi-Stage Fracture | 4489.50 | 4489.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 4172.50 | 4172.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 4118.50 | 4118.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 4064.60 | 4064.70 | 0 |
2019-07-23 | Multi-Stage Fracture | 4023.70 | 4023.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3978.90 | 3979.00 | 0 |
2019-07-20 | Multi-Stage Fracture | 5184.70 | 5184.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3934.70 | 3934.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3889.90 | 3890.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3846.20 | 3846.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3801.10 | 3801.20 | 0 |
2019-07-23 | Multi-Stage Fracture | 3756.40 | 3756.50 | 0 |
2019-07-23 | Multi-Stage Fracture | 3711.60 | 3711.70 | 0 |
2019-07-23 | Multi-Stage Fracture | 3666.90 | 3667.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3623.70 | 3623.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3581.70 | 3581.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3540.80 | 3540.90 | 0 |
2019-07-20 | Multi-Stage Fracture | 5133.20 | 5133.30 | 0 |
2019-07-23 | Multi-Stage Fracture | 3495.90 | 3496.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3453.10 | 3453.20 | 0 |
2019-07-23 | Multi-Stage Fracture | 3412.70 | 3412.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3370.90 | 3371.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3330.50 | 3330.60 | 0 |
2019-07-23 | Multi-Stage Fracture | 3289.90 | 3290.00 | 0 |
2019-07-23 | Multi-Stage Fracture | 3249.70 | 3249.80 | 0 |
2019-07-23 | Multi-Stage Fracture | 3208.40 | 3208.50 | 0 |
2019-07-24 | Multi-Stage Fracture | 3168.00 | 3168.10 | 0 |
2019-07-24 | Multi-Stage Fracture | 3127.60 | 3127.70 | 0 |
2019-07-20 | Multi-Stage Fracture | 5080.00 | 5080.10 | 0 |
2019-07-24 | Multi-Stage Fracture | 3087.40 | 3087.50 | 0 |
2019-07-24 | Multi-Stage Fracture | 3047.40 | 3047.50 | 0 |
2019-07-24 | Multi-Stage Fracture | 3004.10 | 3004.20 | 0 |
2019-07-24 | Multi-Stage Fracture | 2959.30 | 2959.40 | 0 |
2019-07-20 | Multi-Stage Fracture | 5028.10 | 5028.20 | 0 |
2019-07-20 | Multi-Stage Fracture | 4974.90 | 4975.00 | 0 |
2019-07-20 | Multi-Stage Fracture | 4921.70 | 4921.80 | 0 |
2019-07-20 | Multi-Stage Fracture | 4868.70 | 4868.80 | 0 |
2019-07-20 | Multi-Stage Fracture | 4814.70 | 4814.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-07-20 | 2019-07-24 | 2,738 | 16,902 | N/A |
2 | 2019-07-23 | 2019-07-24 | 2,738 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 86.5215 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 11.1047 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 2.2262 | N/A | ||
Secure BIO-10B (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0086 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0086 | N/A | ||||
SFR-110 (Friction Reducer) | Step Energy Services | Friction Reducer | Mineral Oil | 8012-95-1 | 100 | 0.0953 | N/A | |
Polyacrylamide | 5/8/9003 | 100 | 0.0953 | N/A | ||||
Primary Alcohol Ethoxylatehigh | 68131-39-5 | 100 | 0.0953 | N/A | ||||
Sodium 2-Acryloylamino-2-methyl-1-propanesulfonic | 15214-89-8 | 100 | 0.0953 | N/A | ||||
Sodium Acrylate | 7446-81-3 | 100 | 0.0953 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0953 | N/A | ||||
SNE-8C (Non-Emulsifier) | Step Energy Services | Surfactant | Alkyl Sulfonic Acid | 11745 | 100 | 0.0424 | N/A | |
Methanol | 67-56-1 | 100 | 0.0424 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0424 | N/A | ||||
2 | SCBO-2 (Breaker) | Step Energy Services | Breaker | Ammonium Persulfate | 7727-54-0 | 100 | 0.0015 | N/A |
Cured Acrylic Resin | Not Available | 100 | 0.0015 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0015 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-07-19 | 2019-07-29 | Surface Water - Runoff | 4974 |
2019-07-20 | 2019-07-29 | Surface Water - Runoff | 5298 |
2019-07-20 | 2019-07-21 | Surface Water - Runoff | 1910 |
2019-07-22 | 2019-07-23 | Surface Water - Runoff | 4849 |
2019-08-13 | 2019-08-23 | Surface Water - Runoff | 2461 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1514 | 0.0 | 0.0 | 0.0 |
2020 | 1902 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-03-16 | No Incident Encountered | 0.00 | 0.00 |
2019-08-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]