X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686083111000

Well Details

Well ID: 0686083111000
Loading map...
Location: 00/11-31-068-08W6/0
Location Alias: 00/11-31-68-08 W6M
Location Alias 2: 00/11-31-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: DAYLIGHT ELM 11-31-68-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0409644
License Date: 2009-03-12
License Status: Issued
Spud Date: 2009-09-19
Final Drill Date: 2009-11-14
Well Total Depth: 4010.00 m
Surface Hole Latitude: 54.923931
Surface Hole Longitude: -119.196556

For data sources see[1][2]

Well History

Date Event
2009-03-12 Obtained License
2009-09-22 Surface Casing Operation Performed
2009-10-04 Direction Drilling Operation Performed - Horizontal
2009-10-24 Intermediate Casing Operation Performed
2009-10-24 Well Log Performed
2009-11-14 Finished Drilling
2009-11-14 Well Mode changed to Drilled and Cased
2009-11-16 Well Log Performed
2009-11-18 Production Casing Operation Performed
2009-11-20 Rig Released
2010-11-12 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-12 Perforation Treatment Performed - Open-Hole Completion
2010-11-13 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-21 Well Log Performed
2010-11-22 Well Log Performed
2010-12-01 Well Began Production
2010-12-01 Well Fluid changed to Gas
2010-12-01 Well Mode changed to Flowing
2011-05-09 Well Log Performed
2012-07-05 Well Log Performed
2015-12-10 Well Log Performed
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-10-04 2303.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-12 Open Hole/Barefoot Completion 4008.00 4010.00 0
2010-11-15 Multi-Stage Fracture 3181.20 3181.30 0
2010-11-15 Multi-Stage Fracture 3096.00 3096.10 0
2010-11-15 Multi-Stage Fracture 3022.60 3022.70 0
2010-11-12 Multi-Stage Fracture 3991.80 3991.90 0
2010-11-13 Multi-Stage Fracture 3880.30 3880.40 0
2010-11-13 Multi-Stage Fracture 3796.60 3796.70 0
2010-11-14 Multi-Stage Fracture 3722.10 3722.20 0
2010-11-14 Multi-Stage Fracture 3631.70 3631.80 0
2010-11-14 Multi-Stage Fracture 3480.70 3480.80 0
2010-11-14 Multi-Stage Fracture 3382.80 3382.90 0
2010-11-14 Multi-Stage Fracture 3284.60 3284.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 240 0.0 0.0 0.0
2011 7767 0.0 0.0 0.0
2012 7006 0.0 0.0 0.0
2013 8504 0.0 0.0 0.0
2014 8067 0.0 0.0 0.0
2015 5206 0.0 0.0 0.0
2016 3 0.0 0.0 0.0
2017 310 0.0 0.0 0.0
2018 7095 0.0 0.0 0.0
2019 7185 0.0 0.0 0.0
2020 1074 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-11-15 No Incident Encountered 0.00 0.00
2015-12-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References