X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686082915000

Well Details

Well ID: 0686082915000
Loading map...
Location: 00/15-29-068-08W6/0
Location Alias: 00/15-29-68-08 W6M
Location Alias 2: 00/15-29-068-08 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 08
Section: 29
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL ET AL HZ ELM 15-29-68-8
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0436462
License Date: 2011-08-31
License Status: Amended
Spud Date: 2011-09-28
Final Drill Date: 2011-11-23
Well Total Depth: 3922.00 m
Surface Hole Latitude: 54.923936
Surface Hole Longitude: -119.198110

For data sources see[1][2]

Well History

Date Event
2011-08-31 Obtained License
2011-09-30 Surface Casing Operation Performed
2011-10-09 Direction Drilling Operation Performed - Horizontal
2011-10-17 Intermediate Casing Operation Performed
2011-10-18 Well Log Performed
2011-11-23 Finished Drilling
2011-11-23 Well Log Performed
2011-11-23 Well Mode changed to Drilled and Cased
2011-11-27 Liner Casing Operation Performed
2011-11-29 Rig Released
2012-01-01 Well Began Production
2012-01-01 Well Fluid changed to Gas
2012-01-01 Well Mode changed to Flowing
2012-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-06 Perforation Treatment Performed - Open-Hole Completion
2012-01-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-01-12 Well Log Performed
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-09 2480.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-06 Open Hole/Barefoot Completion 3895.00 3922.00 0
2012-01-08 Multi-Stage Fracture 3167.30 3167.40 0
2012-01-09 Multi-Stage Fracture 3085.70 3085.80 0
2012-01-09 Multi-Stage Fracture 2992.60 2992.70 0
2012-01-09 Multi-Stage Fracture 2899.00 2899.10 0
2012-01-06 Multi-Stage Fracture 3871.90 3872.00 0
2012-01-06 Multi-Stage Fracture 3809.80 3809.90 0
2012-01-06 Multi-Stage Fracture 3716.40 3716.50 0
2012-01-07 Multi-Stage Fracture 3622.80 3622.90 0
2012-01-07 Multi-Stage Fracture 3529.20 3529.30 0
2012-01-07 Multi-Stage Fracture 3448.10 3448.20 0
2012-01-08 Multi-Stage Fracture 3354.50 3354.60 0
2012-01-08 Multi-Stage Fracture 3260.80 3260.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5009 0.0 0.0 0.0
2013 8539 0.0 0.0 0.0
2014 8029 0.0 0.0 0.0
2015 6994 0.0 0.0 0.0
2016 5035 0.0 0.0 0.0
2017 6568 0.0 0.0 0.0
2018 8558 0.0 0.0 0.0
2019 7297 0.0 0.0 0.0
2020 1270 0.0 0.0 0.0

For data sources see[6]

References