If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0686082907000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.923936,"lon":-119.197337,"icon":""}]} |
Location: 00/07-29-068-08W6/0 | |
Location Alias: 00/07-29-68-08 W6M | |
Location Alias 2: 00/07-29-068-08 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 6 | |
Range: 08 | |
Section: 29 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: DAYLIGHT HZ ELM 7-29-68-8 | |
Operator Name: Sinopec Daylight Energy Ltd. | |
License Number: 0428368 | |
License Date: 2010-12-20 | |
License Status: Amended | |
Spud Date: 2011-01-22 | |
Final Drill Date: 2011-03-30 | |
Well Total Depth: 4128.00 m | |
Surface Hole Latitude: 54.923936 | |
Surface Hole Longitude: -119.197337 |
Date | Event |
---|---|
2010-12-20 | Obtained License |
2011-01-25 | Surface Casing Operation Performed |
2011-02-10 | Direction Drilling Operation Performed - Horizontal |
2011-02-22 | Well Log Performed |
2011-02-27 | Intermediate Casing Operation Performed |
2011-03-30 | Finished Drilling |
2011-03-30 | Well Mode changed to Drilled and Cased |
2011-03-31 | Well Log Performed |
2011-04-03 | Liner Casing Operation Performed |
2011-04-04 | Rig Released |
2011-04-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-26 | Perforation Treatment Performed - Open-Hole Completion |
2011-04-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-04-30 | Perforation Treatment Performed - Fractured |
2011-04-30 | Perforation Treatment Performed - Jet Perforation |
2011-04-30 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-01 | Well Began Production |
2011-05-01 | Well Fluid changed to Gas |
2011-05-01 | Well Mode changed to Flowing |
2011-05-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-05-07 | Well Log Performed |
2018-02-01 | Well Fluid changed to Gas |
2018-02-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-10 | 2478.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-04-26 | Open Hole/Barefoot Completion | 4123.00 | 4128.00 | 0 |
2011-05-02 | Multi-Stage Fracture | 3590.90 | 3591.00 | 0 |
2011-05-02 | Multi-Stage Fracture | 3530.50 | 3530.60 | 0 |
2011-05-02 | Multi-Stage Fracture | 3453.60 | 3453.70 | 0 |
2011-05-02 | Multi-Stage Fracture | 3348.60 | 3348.70 | 0 |
2011-05-03 | Multi-Stage Fracture | 3271.40 | 3271.50 | 0 |
2011-05-03 | Multi-Stage Fracture | 3167.40 | 3167.50 | 0 |
2011-05-04 | Multi-Stage Fracture | 3091.80 | 3091.90 | 0 |
2011-05-04 | Multi-Stage Fracture | 3014.80 | 3014.90 | 0 |
2011-05-04 | Multi-Stage Fracture | 2924.20 | 2924.30 | 0 |
2011-04-26 | Multi-Stage Fracture | 4099.70 | 4099.80 | 0 |
2011-04-26 | Multi-Stage Fracture | 4030.30 | 4030.40 | 0 |
2011-04-27 | Multi-Stage Fracture | 3939.70 | 3939.80 | 0 |
2011-04-30 | Multi-Stage Fracture | 3848.60 | 3848.70 | 0 |
2011-04-30 | Perforation | 3844.60 | 3846.60 | 17 |
2011-04-30 | Fracture | 3844.60 | 3846.60 | 0 |
2011-05-01 | Multi-Stage Fracture | 3772.20 | 3772.30 | 0 |
2011-05-01 | Multi-Stage Fracture | 3682.20 | 3682.30 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 4731 | 0.0 | 0.0 | 0.0 |
2012 | 6806 | 0.0 | 0.0 | 0.0 |
2013 | 8433 | 0.0 | 0.0 | 0.0 |
2014 | 7992 | 0.0 | 0.0 | 0.0 |
2015 | 5199 | 0.0 | 0.0 | 0.0 |
2016 | 5645 | 0.0 | 0.0 | 0.0 |
2017 | 5731 | 0.0 | 0.0 | 0.0 |
2018 | 8311 | 0.0 | 0.0 | 0.0 |
2019 | 7200 | 0.0 | 0.0 | 0.0 |
2020 | 1079 | 0.0 | 0.0 | 0.0 |
For data sources see[6]