X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686050514000

Well Details

Well ID: 0686050514000
Loading map...
Location: 00/14-05-068-05W6/0
Location Alias: 00/14-05-68-05 W6M
Location Alias 2: 00/14-05-068-05 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 05
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ GOLDCK 14-5-68-5
Operator Name: Shell Canada Limited
License Number: 0475100
License Date: 2015-03-31
License Status: Issued
Spud Date: 2015-09-03
Final Drill Date: 2015-09-22
Well Total Depth: 4997.00 m
Surface Hole Latitude: 54.861163
Surface Hole Longitude: -118.766878

For data sources see[1][2]

Well History

Date Event
2015-03-31 Obtained License
2015-09-04 Direction Drilling Operation Performed - Deviate
2015-09-04 Surface Casing Operation Performed
2015-09-12 Direction Drilling Operation Performed - Horizontal
2015-09-13 Intermediate Casing Operation Performed
2015-09-13 Well Log Performed
2015-09-22 Finished Drilling
2015-09-22 Well Log Performed
2015-09-22 Well Mode changed to Drilled and Cased
2015-09-23 Well Log Performed
2015-09-25 Liner Casing Operation Performed
2015-09-26 Rig Released
2015-12-28 Perforation Treatment Performed - Open-Hole Completion
2015-12-28 Well Log Performed
2016-01-10 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-11 Perforation Treatment Performed - Multi-Stage Fracture
2016-04-02 Well Fluid changed to Gas
2016-04-02 Well Mode changed to Testing
2016-05-01 Well Began Production
2016-05-01 Well Fluid changed to Gas
2016-05-01 Well Mode changed to Flowing
2017-04-23 Well Fluid changed to Shale Gas Only
2017-04-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-03 Precision Drilling Corporation 530 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-04 234.20 Deviate (5 - 79 degrees)
2015-09-12 2706.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-28 Open Hole/Barefoot Completion 4990.00 4997.00 0
2016-01-10 Multi-Stage Fracture 4341.50 4342.50 0
2016-01-11 Multi-Stage Fracture 4253.50 4254.40 0
2016-01-11 Multi-Stage Fracture 4165.60 4166.60 0
2016-01-11 Multi-Stage Fracture 4091.80 4092.70 0
2016-01-11 Multi-Stage Fracture 4005.10 4006.00 0
2016-01-11 Multi-Stage Fracture 3930.40 3931.30 0
2016-01-11 Multi-Stage Fracture 3846.10 3847.00 0
2016-01-11 Multi-Stage Fracture 3757.30 3758.30 0
2016-01-11 Multi-Stage Fracture 3683.50 3684.40 0
2016-01-11 Multi-Stage Fracture 3594.40 3595.40 0
2016-01-10 Multi-Stage Fracture 4964.20 4967.80 0
2016-01-11 Multi-Stage Fracture 3506.20 3507.10 0
2016-01-11 Multi-Stage Fracture 3431.60 3432.50 0
2016-01-11 Multi-Stage Fracture 3343.00 3344.00 0
2016-01-11 Multi-Stage Fracture 3269.20 3270.00 0
2016-01-11 Multi-Stage Fracture 3195.60 3196.50 0
2016-01-11 Multi-Stage Fracture 3106.80 3107.70 0
2016-01-11 Multi-Stage Fracture 3018.10 3019.00 0
2016-01-11 Multi-Stage Fracture 2943.80 2944.70 0
2016-01-11 Multi-Stage Fracture 2854.60 2855.60 0
2016-01-10 Multi-Stage Fracture 4900.70 4901.60 0
2016-01-10 Multi-Stage Fracture 4827.20 4828.10 0
2016-01-10 Multi-Stage Fracture 4740.00 4741.00 0
2016-01-10 Multi-Stage Fracture 4665.70 4666.70 0
2016-01-10 Multi-Stage Fracture 4579.80 4580.70 0
2016-01-10 Multi-Stage Fracture 4505.20 4506.10 0
2016-01-10 Multi-Stage Fracture 4416.00 4417.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-10 2016-01-11 2,534 0 N/A
2 2016-01-11 2016-01-11 2,534 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 84.8441 N/A
SAND - CRC - 30/50 Halliburton Crystalline silica. quartz 14808-60-7 100 0.867 N/A
Hexamethylenetetramine 100-97-0 100 0.85 N/A
Phenol / formaldehyde resin 9003-35-4 100 0.86 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 13.6984 N/A
SAND-COMMON BROWN 100 MESH Halliburton Crystalline silica. quartz 14808-60-7 100 0.4705 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.046 N/A
Ethoxylated alcohols 9068 100 0.046 N/A
Fatty nitrogen derived amides 9068 100 0.046 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.046 N/A
Inert ingredient(s) Not Available 100 0.0461 N/A
Proprietary ingredient(s) Trade Secret 100 0.0462 N/A
MC S-2730 Halliburton Scale Inhibitor Inert ingredient Not Available 100 0.0162 N/A
Methyl alcohol 67-56-1 100 0.0162 N/A
Phosphonic acid. (((phosphonomethyl)imino)bis(2.1-ethanediy
l
22042-96-2 100 0.0162 N/A
2 METHANOL Halliburton Solvent Methanol 67-56-1 100 0.4367 N/A
Water 7732-18-5 100 0.4367 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-12-01 2015-12-03 Surface Water - River 1824
2015-12-03 2015-12-05 Surface Water - River 976
2015-12-05 2015-12-05 Surface Water - River 2752
2015-12-03 2015-12-03 Surface Water - River 383
2015-12-02 2016-02-02 Surface Water - River 377
2015-11-27 2015-11-27 Surface Water - River 337
2016-01-03 2016-01-13 Surface Water - River 7007

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4210 0.0 0.0 0.0
2017 3027 0.0 0.0 0.0
2018 2712 0.0 0.0 0.0
2019 4405 0.0 0.0 0.0
2020 1477 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-26 No Incident Encountered 0.00 0.00
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References