X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0686050511020

Well Details

Well ID: 0686050511020
Loading map...
Location: 02/11-05-068-05W6/0
Location Alias: 02/11-05-68-05 W6M
Location Alias 2: 02/11-05-068-05 W6/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 6
Range: 05
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: SCL HZ 102 GOLDCK 11-5-68-5
Operator Name: Shell Canada Limited
License Number: 0475101
License Date: 2015-03-31
License Status: Issued
Spud Date: 2015-09-28
Final Drill Date: 2015-10-16
Well Total Depth: 5013.00 m
Surface Hole Latitude: 54.861032
Surface Hole Longitude: -118.766878

For data sources see[1][2]

Well History

Date Event
2015-03-31 Obtained License
2015-09-29 Surface Casing Operation Performed
2015-10-01 Direction Drilling Operation Performed - Deviate
2015-10-07 Direction Drilling Operation Performed - Horizontal
2015-10-08 Well Log Performed
2015-10-09 Intermediate Casing Operation Performed
2015-10-16 Finished Drilling
2015-10-16 Well Log Performed
2015-10-16 Well Mode changed to Drilled and Cased
2015-10-17 Well Log Performed
2015-10-19 Liner Casing Operation Performed
2015-10-20 Rig Released
2015-12-28 Perforation Treatment Performed - Open-Hole Completion
2016-01-08 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-09 Perforation Treatment Performed - Multi-Stage Fracture
2016-04-07 Well Fluid changed to Gas
2016-04-07 Well Mode changed to Testing
2016-05-01 Well Began Production
2016-05-01 Well Fluid changed to Gas
2016-05-01 Well Mode changed to Flowing
2017-04-23 Well Fluid changed to Gas
2017-04-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-28 Precision Drilling Corporation 530 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-10-01 1313.30 Deviate (5 - 79 degrees)
2015-10-07 2721.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-28 Open Hole/Barefoot Completion 5003.80 5013.00 0
2016-01-09 Multi-Stage Fracture 4358.00 4359.00 0
2016-01-09 Multi-Stage Fracture 4270.40 4271.40 0
2016-01-09 Multi-Stage Fracture 4196.30 4197.30 0
2016-01-09 Multi-Stage Fracture 4107.60 4108.60 0
2016-01-09 Multi-Stage Fracture 4019.10 4020.10 0
2016-01-09 Multi-Stage Fracture 3945.10 3946.10 0
2016-01-09 Multi-Stage Fracture 3856.50 3857.50 0
2016-01-09 Multi-Stage Fracture 3783.10 3784.10 0
2016-01-09 Multi-Stage Fracture 3696.50 3697.50 0
2016-01-09 Multi-Stage Fracture 3622.40 3623.40 0
2016-01-08 Multi-Stage Fracture 4962.40 4966.10 0
2016-01-09 Multi-Stage Fracture 3492.20 3534.80 0
2016-01-09 Multi-Stage Fracture 3461.30 3462.30 0
2016-01-09 Multi-Stage Fracture 3373.60 3374.60 0
2016-01-09 Multi-Stage Fracture 3288.50 3289.50 0
2016-01-09 Multi-Stage Fracture 3215.90 3216.90 0
2016-01-09 Multi-Stage Fracture 3128.10 3129.10 0
2016-01-09 Multi-Stage Fracture 3041.80 3042.80 0
2016-01-09 Multi-Stage Fracture 2968.40 2969.40 0
2016-01-09 Multi-Stage Fracture 2881.00 2882.00 0
2016-01-08 Multi-Stage Fracture 4902.90 4903.90 0
2016-01-08 Multi-Stage Fracture 4843.50 4844.50 0
2016-01-08 Multi-Stage Fracture 4770.00 4771.00 0
2016-01-08 Multi-Stage Fracture 4681.60 4682.60 0
2016-01-08 Multi-Stage Fracture 4593.80 4594.80 0
2016-01-08 Multi-Stage Fracture 4520.60 4521.60 0
2016-01-08 Multi-Stage Fracture 4431.90 4432.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-01-08 2016-01-09 2,540 0 N/A
2 2016-01-09 2016-01-09 2,540 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Fresh Water Not Available 100 85.5214 N/A
SAND - CRC - 30/50 Halliburton Crystalline silica. quartz 14808-60-7 100 0.738 N/A
Hexamethylenetetramine 100-97-0 100 0.75 N/A
Phenol / formaldehyde resin 9003-35-4 100 0.74 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 13.1717 N/A
SAND-COMMON BROWN 100 MESH Halliburton Crystalline silica. quartz 14808-60-7 100 0.4512 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0463 N/A
Ethoxylated alcohols 9068 100 0.0463 N/A
Fatty nitrogen derived amides 9068 100 0.0463 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0463 N/A
Inert ingredient(s) Not Available 100 0.0463 N/A
Proprietary ingredient(s) Trade Secret 100 0.0466 N/A
MC S-2730 Halliburton Scale Inhibitor Inert ingredient Not Available 100 0.0145 N/A
Methyl alcohol 67-56-1 100 0.0145 N/A
Phosphonic acid. (((phosphonomethyl)imino)bis(2.1-ethanediy
l
22042-96-2 100 0.0145 N/A
2 METHANOL Halliburton Solvent Methanol 67-56-1 100 0.5862 N/A
Water 7732-18-5 100 0.4862 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-12-01 2015-12-03 Surface Water - River 1932
2015-12-03 2015-12-05 Surface Water - River 1034
2015-12-05 2015-12-05 Surface Water - River 2915
2015-12-03 2015-12-03 Surface Water - River 406
2015-12-02 2015-12-02 Surface Water - River 399
2015-11-27 2015-11-27 Surface Water - River 357
2016-01-03 2016-01-13 Surface Water - River 7423

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 3920 0.0 0.0 0.0
2017 4028 0.0 0.0 0.0
2018 3912 0.0 0.0 0.0
2019 4948 0.0 0.0 0.0
2020 624 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-10-20 No Incident Encountered 0.00 0.00
2016-01-26 No Incident Encountered 0.00 0.00

For data sources see[10]

References