X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685252313020

Well Details

Well ID: 0685252313020
Loading map...
Location: 02/13-23-068-25W5/0
Location Alias: 02/13-23-68-25 W5M
Location Alias 2: 02/13-23-068-25 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 25
Section: 23
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ 102 ANTEN 13-23-68-25
Operator Name: ARC Resources Ltd.
License Number: 0495399
License Date: 2019-08-08
License Status: Issued
Spud Date: 2019-12-15
Final Drill Date: 2020-02-04
Well Total Depth: 3572.00 m
Surface Hole Latitude: 54.894385
Surface Hole Longitude: -117.690523

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-15 Precision Drilling Corporation 465 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-01 1575.60 Deviate (5 - 79 degrees)
2020-02-02 1902.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-12 Multi-Stage Fracture 3489.50 3489.60 0
2020-03-12 Multi-Stage Fracture 2759.70 2759.80 0
2020-03-12 Multi-Stage Fracture 2678.30 2678.40 0
2020-03-12 Multi-Stage Fracture 2599.10 2599.20 0
2020-03-12 Multi-Stage Fracture 2518.30 2518.40 0
2020-03-12 Multi-Stage Fracture 2436.80 2436.90 0
2020-03-12 Multi-Stage Fracture 2354.70 2354.80 0
2020-03-12 Multi-Stage Fracture 2273.30 2273.40 0
2020-03-12 Multi-Stage Fracture 2193.50 2193.60 0
2020-03-12 Multi-Stage Fracture 2111.50 2111.60 0
2020-03-12 Multi-Stage Fracture 2030.10 2030.20 0
2020-03-12 Multi-Stage Fracture 3408.40 3408.50 0
2020-03-12 Multi-Stage Fracture 1949.10 1949.20 0
2020-03-12 Multi-Stage Fracture 3326.90 3327.00 0
2020-03-12 Multi-Stage Fracture 3244.90 3245.00 0
2020-03-12 Multi-Stage Fracture 3166.90 3167.00 0
2020-03-12 Multi-Stage Fracture 3085.00 3085.10 0
2020-03-12 Multi-Stage Fracture 3002.70 3002.80 0
2020-03-12 Multi-Stage Fracture 2921.10 2921.20 0
2020-03-12 Multi-Stage Fracture 2839.20 2839.30 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-15 No Incident Encountered 0.00 0.00
2020-02-05 No Incident Encountered 0.00 0.00
2020-03-12 No Incident Encountered 0.00 0.00

For data sources see[6]

References