X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685252209020

Well Details

Well ID: 0685252209020
Loading map...
Location: 02/09-22-068-25W5/0
Location Alias: 02/09-22-68-25 W5M
Location Alias 2: 02/09-22-068-25 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 25
Section: 22
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ 102 ANTEN 9-22-68-25
Operator Name: ARC Resources Ltd.
License Number: 0495401
License Date: 2019-08-08
License Status: Issued
Spud Date: 2019-12-16
Final Drill Date: 2020-01-24
Well Total Depth: 3962.00 m
Surface Hole Latitude: 54.894214
Surface Hole Longitude: -117.690430

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-16 Precision Drilling Corporation 465 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-21 1589.20 Deviate (5 - 79 degrees)
2020-01-22 1943.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-14 Multi-Stage Fracture 3878.80 3878.90 0
2020-03-14 Multi-Stage Fracture 3139.80 3139.90 0
2020-03-14 Multi-Stage Fracture 3059.30 3059.40 0
2020-03-14 Multi-Stage Fracture 2979.50 2979.60 0
2020-03-14 Multi-Stage Fracture 2899.80 2899.90 0
2020-03-14 Multi-Stage Fracture 2817.70 2817.80 0
2020-03-14 Multi-Stage Fracture 2738.00 2738.10 0
2020-03-14 Multi-Stage Fracture 2656.00 2656.10 0
2020-03-14 Multi-Stage Fracture 2574.50 2574.60 0
2020-03-14 Multi-Stage Fracture 2492.70 2492.80 0
2020-03-14 Multi-Stage Fracture 2410.80 2410.90 0
2020-03-14 Multi-Stage Fracture 3796.40 3796.50 0
2020-03-14 Multi-Stage Fracture 2328.20 2328.30 0
2020-03-14 Multi-Stage Fracture 2232.50 2232.60 0
2020-03-14 Multi-Stage Fracture 2122.90 2123.00 0
2020-03-14 Multi-Stage Fracture 1948.00 1948.10 0
2020-03-14 Multi-Stage Fracture 3714.00 3714.10 0
2020-03-14 Multi-Stage Fracture 3632.00 3632.10 0
2020-03-14 Multi-Stage Fracture 3549.70 3549.80 0
2020-03-14 Multi-Stage Fracture 3468.20 3468.30 0
2020-03-14 Multi-Stage Fracture 3386.20 3386.30 0
2020-03-14 Multi-Stage Fracture 3304.30 3304.40 0
2020-03-14 Multi-Stage Fracture 3221.90 3222.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-26 No Incident Encountered 0.00 0.00
2020-03-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References