X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685251215000

Well Details

Well ID: 0685251215000
Loading map...
Location: 00/15-12-068-25W5/0
Location Alias: 00/15-12-68-25 W5M
Location Alias 2: 00/15-12-068-25 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 25
Section: 12
County/Municipality: Municipal District of Greenview No. 16
Well Name: ARC HZ ANTEN 15-12-68-25
Operator Name: ARC Resources Ltd.
License Number: 0495404
License Date: 2019-08-08
License Status: Issued
Spud Date: 2019-12-19
Final Drill Date: 2020-01-06
Well Total Depth: 4132.00 m
Surface Hole Latitude: 54.893957
Surface Hole Longitude: -117.690289

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-12-19 Precision Drilling Corporation 465 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-03 1452.60 Deviate (5 - 79 degrees)
2020-01-04 2038.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-03-09 Multi-Stage Fracture 4049.20 4049.30 0
2020-03-09 Multi-Stage Fracture 3310.10 3310.20 0
2020-03-09 Multi-Stage Fracture 3228.60 3228.70 0
2020-03-09 Multi-Stage Fracture 3147.70 3147.80 0
2020-03-09 Multi-Stage Fracture 3065.90 3066.00 0
2020-03-09 Multi-Stage Fracture 2997.70 2997.80 0
2020-03-09 Multi-Stage Fracture 2916.10 2916.20 0
2020-03-09 Multi-Stage Fracture 2834.10 2834.20 0
2020-03-09 Multi-Stage Fracture 2767.50 2767.60 0
2020-03-09 Multi-Stage Fracture 2687.80 2687.90 0
2020-03-09 Multi-Stage Fracture 2605.80 2605.90 0
2020-03-09 Multi-Stage Fracture 3969.00 3969.10 0
2020-03-09 Multi-Stage Fracture 2525.20 2525.30 0
2020-03-10 Multi-Stage Fracture 2443.40 2443.50 0
2020-03-10 Multi-Stage Fracture 2365.90 2366.00 0
2020-03-10 Multi-Stage Fracture 2286.50 2286.60 0
2020-03-10 Multi-Stage Fracture 2180.20 2180.30 0
2020-03-09 Multi-Stage Fracture 3887.60 3887.70 0
2020-03-09 Multi-Stage Fracture 3808.80 3808.90 0
2020-03-09 Multi-Stage Fracture 3727.40 3727.50 0
2020-03-09 Multi-Stage Fracture 3648.20 3648.30 0
2020-03-09 Multi-Stage Fracture 3567.50 3567.60 0
2020-03-09 Multi-Stage Fracture 3472.20 3472.30 0
2020-03-09 Multi-Stage Fracture 3390.90 3391.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-08 No Incident Encountered 0.00 0.00
2020-03-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References