X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685103004000

Well Details

Well ID: 0685103004000
Loading map...
Location: 00/04-30-068-10W5/0
Location Alias: 00/04-30-68-10 W5M
Location Alias 2: 00/04-30-068-10 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 10
Section: 30
County/Municipality: Big Lakes County
Well Name: Aquisition Oil SWANH 4-30-68-10
Operator Name: Acquisition Oil Corp.
License Number: 0023117
License Date: 1962-10-05
License Status: Suspension
Spud Date: 1962-11-20
Final Drill Date: 1962-12-21
Well Total Depth: 2731.30 m
Surface Hole Latitude: 54.909908
Surface Hole Longitude: -115.522183

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-10-05 Obtained License
1962-12-21 Finished Drilling
1962-12-21 Well Mode changed to Drilled and Cased
1962-12-23 Production Casing Operation Performed
1963-01-06 Perforation Treatment Performed - Bullet Perforation
1963-01-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-03-03 Well Began Production
1963-03-03 Well Fluid changed to Crude Oil
1963-03-03 Well Mode changed to Pumping
1986-05-31 Well Fluid changed to Crude Oil
1986-05-31 Well Mode changed to Suspended
1990-09-26 Well Fluid changed to Crude Oil
1990-09-26 Well Mode changed to Pumping
2000-03-28 Well Fluid changed to Crude Oil
2000-03-28 Well Mode changed to Suspended
2000-05-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-21 Plug Back Performed
2000-05-22 Perforation Treatment Performed - Bridge Plug No Cement Required
2000-05-22 Well Fluid changed to Crude Oil
2000-05-22 Well Mode changed to Abandoned and Re-entered
2000-05-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-01-06 Bullet Perforation 2690.20 2692.90 7
1963-01-06 Bullet Perforation 2693.80 2696.60 7
1963-01-06 Bullet Perforation 2703.00 2705.40 7
1963-01-09 Acid Treatment 2690.20 2705.40 0
1963-01-11 Acid Treatment 2690.20 2706.00 0
2000-05-21 Packing Device Capped w/Cement 2677.00 2685.00 0
2000-05-22 Bridge Plug, No Cement 2593.00 2594.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1542 0.0 0.0 0.0
1978 1260 0.0 0.0 0.0
1979 8252 0.0 0.0 0.0
1980 7811 0.0 0.0 0.0
1981 7973 0.0 0.0 0.0
1982 6482 0.0 0.0 0.0
1983 7703 0.0 0.0 0.0
1984 8641 0.0 0.0 0.0
1985 7197 0.0 0.0 0.0
1986 971 0.0 0.0 0.0
1990 141 0.0 0.0 0.0
1992 1352 0.0 0.0 0.0
1993 2000 0.0 0.0 0.0
1994 7207 0.0 0.0 0.0
1995 2160 0.0 0.0 0.0

For data sources see[5]

References