If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0685101612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.888644,"lon":-115.4726,"icon":""}]} |
Location: 00/12-16-068-10W5/0 | |
Location Alias: 00/12-16-68-10 W5M | |
Location Alias 2: 00/12-16-068-10 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 5 | |
Range: 10 | |
Section: 16 | |
County/Municipality: Big Lakes County | |
Well Name: Aquisition Oil SWANH 12-16-68-10 | |
Operator Name: Acquisition Oil Corp. | |
License Number: 0020362 | |
License Date: 1961-02-01 | |
License Status: Suspension | |
Spud Date: 1961-02-08 | |
Final Drill Date: 1961-02-27 | |
Well Total Depth: 2474.40 m | |
Surface Hole Latitude: 54.888644 | |
Surface Hole Longitude: -115.472600 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1961-02-01 | Obtained License |
1961-02-27 | Finished Drilling |
1961-02-27 | Well Mode changed to Drilled and Cased |
1961-03-01 | Production Casing Operation Performed |
1961-04-03 | Perforation Treatment Performed - Bullet Perforation |
1961-04-09 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1961-04-10 | Well Began Production |
1961-04-10 | Well Fluid changed to Crude Oil |
1961-04-10 | Well Mode changed to Flowing |
2000-03-28 | Well Fluid changed to Crude Oil |
2000-03-28 | Well Mode changed to Suspended |
2007-01-28 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1961-04-03 | Bullet Perforation | 2458.50 | 2462.80 | 3 |
1961-04-03 | Bullet Perforation | 2450.30 | 2452.70 | 3 |
1961-04-03 | Bullet Perforation | 2447.20 | 2449.10 | 3 |
1961-04-03 | Bullet Perforation | 2441.40 | 2444.80 | 3 |
1961-04-03 | Bullet Perforation | 2435.00 | 2438.10 | 3 |
1961-04-03 | Bullet Perforation | 2431.10 | 2432.30 | 7 |
1961-04-03 | Bullet Perforation | 2429.30 | 2430.50 | 7 |
1961-04-09 | Acid Treatment | 2429.30 | 2462.80 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
1966 | 0 | 0.0 | 0.0 | 0.0 |
1967 | 8396 | 0.0 | 0.0 | 0.0 |
1968 | 7425 | 0.0 | 0.0 | 0.0 |
1969 | 1504 | 0.0 | 0.0 | 0.0 |
For data sources see[5]