X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685092308000

Well Details

Well ID: 0685092308000
Loading map...
Location: 00/08-23-068-09W5/0
Location Alias: 00/08-23-68-09 W5M
Location Alias 2: 00/08-23-068-09 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 09
Section: 23
County/Municipality: Big Lakes County
Well Name: RIDGEBACK SWANH 8-23-68-9
Operator Name: Ridgeback Resources Inc.
License Number: 0417188
License Date: 2010-01-13
License Status: Amended
Spud Date: 2010-03-01
Final Drill Date: 2010-03-17
Well Total Depth: 3447.00 m
Surface Hole Latitude: 54.893878
Surface Hole Longitude: -115.238787

For data sources see[1][2]

Well History

Date Event
2010-01-13 Obtained License
2010-03-03 Surface Casing Operation Performed
2010-03-08 Direction Drilling Operation Performed - Horizontal
2010-03-11 Intermediate Casing Operation Performed
2010-03-17 Finished Drilling
2010-03-17 Well Log Performed
2010-03-17 Well Mode changed to Drilled and Cased
2010-03-19 Liner Casing Operation Performed
2010-03-20 Rig Released
2010-03-24 Well Log Performed
2010-03-31 Well Log Performed
2010-04-01 Perforation Treatment Performed - Multi-Stage Fracture
2010-04-01 Perforation Treatment Performed - Open-Hole Completion
2010-04-03 Well Began Production
2010-04-03 Well Fluid changed to Crude Oil
2010-04-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-03-08 2081.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-04-01 Open Hole/Barefoot Completion 3430.00 3447.00 0
2010-04-01 Multi-Stage Fracture 3384.50 3384.60 0
2010-04-01 Multi-Stage Fracture 3402.40 3402.50 0
2010-04-01 Multi-Stage Fracture 2355.00 2355.10 0
2010-04-01 Multi-Stage Fracture 2484.60 2484.70 0
2010-04-01 Multi-Stage Fracture 2628.30 2628.40 0
2010-04-01 Multi-Stage Fracture 2758.30 2758.40 0
2010-04-01 Multi-Stage Fracture 2846.60 2846.70 0
2010-04-01 Multi-Stage Fracture 2996.70 2996.80 0
2010-04-01 Multi-Stage Fracture 3146.30 3146.40 0
2010-04-01 Multi-Stage Fracture 3311.00 3311.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6236 0.0 0.0 0.0
2011 8292 0.0 0.0 0.0
2012 6173 0.0 0.0 0.0
2013 8708 0.0 0.0 0.0
2014 7476 0.0 0.0 0.0
2015 8666 0.0 0.0 0.0
2016 6688 0.0 0.0 0.0
2018 2820 0.0 0.0 0.0
2019 8648 0.0 0.0 0.0
2020 2145 0.0 0.0 0.0

For data sources see[6]

References