X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685081912000

Well Details

Well ID: 0685081912000
Loading map...
Location: 00/12-19-068-08W5/0
Location Alias: 00/12-19-68-08 W5M
Location Alias 2: 00/12-19-068-08 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 08
Section: 19
County/Municipality: Big Lakes County
Well Name: ASPENLEAF SWANH 12-19-68-8
Operator Name: Aspenleaf Energy Limited
License Number: 0025805
License Date: 1964-03-02
License Status: Issued
Spud Date: 1964-03-02
Final Drill Date: 1964-03-24
Well Total Depth: 2330.20 m
Surface Hole Latitude: 54.903171
Surface Hole Longitude: -115.218392

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1964-03-02 Obtained License
1964-03-24 Finished Drilling
1964-03-24 Well Mode changed to Drilled and Cased
1964-03-26 Production Casing Operation Performed
1964-11-06 Perforation Treatment Performed - Jet Perforation
1964-11-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-12-26 Well Began Production
1964-12-26 Well Fluid changed to Crude Oil
1964-12-26 Well Mode changed to Pumping
1966-08-04 Well Fluid changed to Crude Oil
1966-08-04 Well Mode changed to Suspended
1968-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-19 Well Fluid changed to Crude Oil
1982-04-19 Well Mode changed to Pumping
1996-10-01 Well Fluid changed to Crude Oil
1996-10-01 Well Mode changed to Suspended
2000-12-01 Well Fluid changed to Crude Oil
2000-12-01 Well Mode changed to Pumping
2010-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-10-08 Perforation Treatment Performed - Jet Perforation
2010-10-08 Plug Back Performed
2010-10-08 Well Fluid changed to Crude Oil
2010-10-08 Well Mode changed to Abandoned Zone
2010-10-09 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-11-06 Perforation 2283.90 2285.40 7
1964-11-06 Perforation 2291.80 2294.50 7
1964-11-06 Perforation 2295.80 2299.10 7
1964-11-06 Perforation 2307.30 2309.50 7
1964-11-07 Acid Treatment 2283.90 2309.50 0
1968-08-16 Acid Treatment 2283.90 2309.50 0
2010-10-08 Packing Device Capped w/Cement 2271.00 2279.00 0
2010-10-08 Perforation 1156.00 1169.00 17
2010-10-09 Fracture 1156.00 1169.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1982 5824 0.0 0.0 0.0
1983 8711 0.0 0.0 0.0
1984 5062 0.0 0.0 0.0
1985 8063 0.0 0.0 0.0
1986 7175 0.0 0.0 0.0
1987 8517 0.0 0.0 0.0
1988 8306 0.0 0.0 0.0
1989 7631 0.0 0.0 0.0
1990 8292 0.0 0.0 0.0
1991 8232 0.0 0.0 0.0
1992 8735 0.0 0.0 0.0
1993 8399 0.0 0.0 0.0
1994 2174 0.0 0.0 0.0
1995 4127 0.0 0.0 0.0
2000 168 0.0 0.0 0.0
2001 8000 0.0 0.0 0.0
2002 8565 0.0 0.0 0.0
2003 8735 0.0 0.0 0.0
2004 7427 0.0 0.0 0.0
2005 8555 0.0 0.0 0.0
2006 8528 0.0 0.0 0.0
2007 8126 0.0 0.0 0.0
2008 8091 0.0 0.0 0.0
2009 5579 0.0 0.0 0.0
2010 2783 0.0 0.0 0.0

For data sources see[5]

References