X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0685032506000

Well Details

Well ID: 0685032506000
Loading map...
Location: 00/06-25-068-03W5/0
Location Alias: 00/06-25-68-03 W5M
Location Alias 2: 00/06-25-068-03 W5/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 5
Range: 03
Section: 25
County/Municipality: Municipal District of Lesser Slave River No. 124
Well Name: CARDINAL MITSUE 6-25-68-3
Operator Name: Cardinal Energy Ltd.
License Number: 0083777
License Date: 1980-06-26
License Status: Suspension
Spud Date: 1980-07-02
Final Drill Date: 1980-07-20
Well Total Depth: 1728.00 m
Surface Hole Latitude: 54.913858
Surface Hole Longitude: -114.323783

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-06-26 Obtained License
1980-07-10 Lost Circulation Occurred
1980-07-13 Perforation Treatment Performed - Jet Perforation
1980-07-20 Finished Drilling
1980-07-22 Drill Stem Test Performed
1980-07-24 Production Casing Operation Performed
1980-07-24 Well Mode changed to Drilled and Cased
1980-09-05 Well Began Production
1980-09-05 Well Fluid changed to Crude Oil
1980-09-05 Well Mode changed to Flowing
1982-10-16 Perforation Treatment Performed - Jet Perforation
1988-03-12 Well Fluid changed to Crude Oil
1988-03-12 Well Mode changed to Pumping
1992-12-02 Well Log Performed
1992-12-03 Perforation Treatment Performed - Jet Perforation
1993-04-22 Well Fluid changed to Crude Oil
1993-04-22 Well Mode changed to Suspended
1995-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-14 Plug Back Performed
1995-08-14 Well Fluid changed to Crude Oil
1995-08-14 Well Log Performed
1995-08-14 Well Mode changed to Abandoned and Whipstocked
1995-08-15 Perforation Treatment Performed - Jet Perforation
1995-08-15 Well Log Performed
1995-08-17 Perforation Treatment Performed - Jet Perforation
1995-08-17 Well Log Performed
1995-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-19 Perforation Treatment Performed - Cement Squeeze
1995-08-23 Well Log Performed
1995-09-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-13 Perforation 1681.00 1683.00 13
1982-10-16 Perforation 1683.00 1685.00 13
1992-12-03 Perforation 1682.00 1686.00 13
1995-08-14 Packing Device Capped w/Cement 1664.00 1672.00 0
1995-08-15 Perforation 1090.00 1092.00 13
1995-08-15 Perforation 1000.00 1002.00 13
1995-08-17 Perforation 1050.00 1052.00 13
1995-08-19 Cement Squeeze 1000.00 1092.00 0
1995-08-19 Packing Device Capped w/Cement 1039.00 1047.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 672 0.0 0.0 0.0
1981 1392 0.0 0.0 0.0
1982 1466 0.0 0.0 0.0
1983 1290 0.0 0.0 0.0
1984 835 0.0 0.0 0.0
1985 1166 0.0 0.0 0.0
1986 4641 0.0 0.0 0.0
1987 7064 0.0 0.0 0.0
1988 7960 0.0 0.0 0.0
1989 4153 0.0 0.0 0.0
1990 1344 0.0 0.0 0.0
1991 8314 0.0 0.0 0.0
1992 7794 0.0 0.0 0.0
1993 2669 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-07-10 Lost Circulation 858.00 1209.00

For data sources see[6]

References