X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684043309000

Well Details

Well ID: 0684043309000
Loading map...
Location: 00/09-33-068-04W4/0
Location Alias: 00/09-33-68-04 W4M
Location Alias 2: 00/09-33-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 33
County/Municipality: Improvement District No. 349
Well Name: CNRL OBS FISHER 9-33-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0474233
License Date: 2015-01-13
License Status: Suspension
Spud Date: 2015-02-20
Final Drill Date: 2015-02-23
Well Total Depth: 535.00 m
Surface Hole Latitude: 54.931001
Surface Hole Longitude: -110.542909

For data sources see[1][2]

Well History

Date Event
2015-01-13 Obtained License
2015-02-22 Surface Casing Operation Performed
2015-02-23 Finished Drilling
2015-02-23 Well Log Performed
2015-02-23 Well Mode changed to Drilled and Cased
2015-02-24 Production Casing Operation Performed
2015-02-24 Rig Released
2015-02-24 Well Log Performed
2019-03-11 Well Log Performed
2019-03-12 Perforation Treatment Performed - Jet Perforation
2019-03-12 Well Log Performed
2020-02-17 Well Log Performed
2020-02-21 Perforation Treatment Performed - Jet Perforation
2020-02-21 Well Log Performed
2020-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-22 Perforation Treatment Performed - Cement Squeeze
2020-02-27 Perforation Treatment Performed - Jet Perforation
2020-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
2020-03-30 Perforation Treatment Performed - Jet Perforation
2020-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-04-10 Perforation Treatment Performed - Cement Squeeze
2020-04-10 Plug Back Performed

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-02-20 Bluerock Energy Services Ltd. 10 N/A Drill To LD

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-12 Perforation 475.50 476.00 20
2020-02-21 Perforation 492.00 493.00 20
2020-02-22 Cement Squeeze 475.50 493.00 0
2020-02-22 Packing Device Capped w/Cement 494.50 503.00 0
2020-02-27 Perforation 479.00 479.50 17
2020-03-18 Acid Treatment 479.00 479.50 0
2020-03-30 Perforation 479.50 480.00 17
2020-04-10 Cement Squeeze 479.00 480.00 0
2020-04-10 Packing Device Capped w/Cement 417.80 490.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-24 No Incident Encountered 0.00 0.00
2019-03-15 No Incident Encountered 0.00 0.00
2020-03-06 No Incident Encountered 0.00 0.00
2020-04-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References