X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684042210020

Well Details

Well ID: 0684042210020
Loading map...
Location: 02/10-22-068-04W4/0
Location Alias: 02/10-22-68-04 W4M
Location Alias 2: 02/10-22-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 22
County/Municipality: Improvement District No. 349
Well Name: CNRL 17A64 PRIMROSE 10-22-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0445702
License Date: 2012-05-04
License Status: Amended
Spud Date: 2012-09-21
Final Drill Date: 2012-11-25
Well Total Depth: 1936.00 m
Surface Hole Latitude: 54.897343
Surface Hole Longitude: -110.540168

For data sources see[1][2]

Well History

Date Event
2012-05-04 Obtained License
2012-09-21 Surface Casing Operation Performed
2012-09-21 Well Mode changed to Preset
2012-11-07 Direction Drilling Operation Performed - Deviate
2012-11-08 Direction Drilling Operation Performed - Horizontal
2012-11-10 Well Log Performed
2012-11-11 Intermediate Casing Operation Performed
2012-11-25 Finished Drilling
2012-11-25 Well Mode changed to Drilled and Cased
2012-11-26 Liner Casing Operation Performed
2012-11-26 Perforation Treatment Performed - Open-Hole Completion
2012-11-26 Perforation Treatment Performed - Slotted Liner or Casing
2012-11-26 Rig Released
2012-11-26 Well Log Performed
2014-02-01 Well Began Production
2014-02-01 Well Fluid changed to Crude Bitumen
2014-02-01 Well Type changed to Cyclical
2017-10-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2018-01-03 Perforation Treatment Performed - Jet Perforation
2018-01-04 Perforation Treatment Performed - Jet Perforation
2018-01-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-11-07 180.00 Deviate (5 - 79 degrees)
2012-11-08 637.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-11-26 Slotted Liner 1008.00 1921.00 0
2018-01-04 Perforation 1623.20 1629.20 10
2018-01-04 Perforation 1585.70 1591.70 10
2018-01-04 Perforation 1548.30 1554.30 10
2018-01-04 Perforation 1510.70 1516.70 10
2018-01-04 Perforation 1473.20 1479.20 10
2018-01-04 Perforation 1448.10 1454.10 10
2018-01-05 Perforation 1385.40 1391.40 10
2018-01-05 Perforation 1347.80 1353.80 10
2018-01-05 Perforation 1310.10 1316.10 10
2018-01-05 Perforation 1272.50 1277.50 10
2012-11-26 Open Hole/Barefoot Completion 1921.00 1936.00 0
2018-01-05 Perforation 1234.80 1240.80 10
2018-01-05 Perforation 1197.20 1203.20 10
2018-01-05 Perforation 1159.60 1165.60 10
2018-01-05 Perforation 1122.40 1128.40 10
2018-01-05 Perforation 1085.40 1091.40 10
2018-01-05 Perforation 1060.40 1066.40 10
2018-01-05 Perforation 1035.30 1041.30 10
2018-01-05 Perforation 1010.20 1016.20 10
2017-10-02 Acid Treatment 1008.00 1936.00 0
2018-01-03 Perforation 1848.80 1854.80 10
2018-01-03 Perforation 1811.30 1817.30 10
2018-01-03 Perforation 1773.70 1779.70 10
2018-01-03 Perforation 1736.20 1742.60 10
2018-01-04 Perforation 1698.50 1704.50 10
2018-01-04 Perforation 1660.90 1666.90 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5095 0.0 0.0 0.0
2015 7153 0.0 0.0 0.0
2016 7104 0.0 0.0 0.0
2017 8245 0.0 0.0 0.0
2018 7397 0.0 0.0 0.0
2019 8474 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-09-21 No Incident Encountered 0.00 0.00
2012-11-26 No Incident Encountered 0.00 0.00
2012-12-30 No Incident Encountered 0.00 0.00
2017-10-02 No Incident Encountered 0.00 0.00
2018-01-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References