X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684042111000

Well Details

Well ID: 0684042111000
Loading map...
Location: 00/11-21-068-04W4/0
Location Alias: 00/11-21-68-04 W4M
Location Alias 2: 00/11-21-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 21
County/Municipality: Improvement District No. 349
Well Name: CNRL 15A60 PRIMROSE 11-21-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0445805
License Date: 2012-05-10
License Status: Issued
Spud Date: 2012-08-11
Final Drill Date: 2012-12-18
Well Total Depth: 1869.00 m
Surface Hole Latitude: 54.897612
Surface Hole Longitude: -110.532383

For data sources see[1][2]

Well History

Date Event
2012-05-10 Obtained License
2012-08-11 Well Mode changed to Preset
2012-08-12 Surface Casing Operation Performed
2012-11-27 Direction Drilling Operation Performed - Deviate
2012-11-28 Direction Drilling Operation Performed - Horizontal
2012-11-29 Well Log Performed
2012-11-30 Intermediate Casing Operation Performed
2012-12-18 Finished Drilling
2012-12-18 Well Log Performed
2012-12-18 Well Mode changed to Drilled and Cased
2012-12-19 Liner Casing Operation Performed
2012-12-19 Perforation Treatment Performed - Open-Hole Completion
2012-12-19 Perforation Treatment Performed - Slotted Liner or Casing
2012-12-19 Rig Released
2014-02-01 Well Began Production
2014-02-01 Well Fluid changed to Crude Bitumen
2014-02-01 Well Type changed to Cyclical
2016-11-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-02-03 Well Log Performed
2019-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-08-11 Groundforce Geodrilling Solutions Inc. 9 N/A Set Surface
2012-12-17 Ensign Drilling Inc. 126 1871 Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-11-27 195.00 Deviate (5 - 79 degrees)
2012-11-28 613.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-19 Slotted Liner 902.00 1852.80 0
2012-12-19 Open Hole/Barefoot Completion 1852.80 1869.00 0
2016-11-30 Acid Treatment 902.00 1869.00 0
2019-02-12 Acid Treatment 902.00 1869.00 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 5181 0.0 0.0 0.0
2015 7151 0.0 0.0 0.0
2016 7175 0.0 0.0 0.0
2017 8242 0.0 0.0 0.0
2018 7349 0.0 0.0 0.0
2019 8611 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-12 No Incident Encountered 0.00 0.00
2012-12-19 No Incident Encountered 0.00 0.00
2013-06-21 No Incident Encountered 0.00 0.00
2016-11-30 No Incident Encountered 0.00 0.00
2019-02-13 No Incident Encountered 0.00 0.00

For data sources see[8]

References