If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0684041911020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.899582,"lon":-110.582706,"icon":""}]} |
Location: 02/11-19-068-04W4/0 | |
Location Alias: 02/11-19-68-04 W4M | |
Location Alias 2: 02/11-19-068-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 068 | |
Meridian: 4 | |
Range: 04 | |
Section: 19 | |
County/Municipality: Improvement District No. 349 | |
Well Name: CNRL PAD 54 6A54 PRIMROSE 11-19-68-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0327876 | |
License Date: 2005-03-10 | |
License Status: Issued | |
Spud Date: 2005-05-19 | |
Final Drill Date: 2006-01-04 | |
Well Total Depth: 1927.00 m | |
Surface Hole Latitude: 54.899582 | |
Surface Hole Longitude: -110.582706 |
Date | Event |
---|---|
2005-03-10 | Obtained License |
2005-05-19 | Surface Casing Operation Performed |
2005-12-06 | Direction Drilling Operation Performed - Horizontal |
2005-12-07 | Well Log Performed |
2005-12-08 | Intermediate Casing Operation Performed |
2006-01-04 | Finished Drilling |
2006-01-04 | Well Log Performed |
2006-01-04 | Well Mode changed to Drilled and Cased |
2006-01-05 | Liner Casing Operation Performed |
2006-01-05 | Perforation Treatment Performed - Open-Hole Completion |
2006-01-05 | Perforation Treatment Performed - Slotted Liner or Casing |
2006-01-05 | Rig Released |
2006-07-14 | Well Began Production |
2006-07-14 | Well Fluid changed to Crude Bitumen |
2006-07-14 | Well Type changed to Cyclical |
2008-03-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2009-11-27 | Perforation Treatment Performed - Jet Perforation |
2009-11-28 | Perforation Treatment Performed - Jet Perforation |
2009-11-30 | Perforation Treatment Performed - Jet Perforation |
2009-12-01 | Perforation Treatment Performed - Jet Perforation |
2009-12-02 | Perforation Treatment Performed - Jet Perforation |
2011-10-22 | Well Log Performed |
2011-10-25 | Well Log Performed |
2013-07-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2014-07-31 | Well Fluid changed to Crude Bitumen |
2014-07-31 | Well Mode changed to Suspended |
2014-07-31 | Well Type changed to Cyclical |
2014-08-13 | Perforation Treatment Performed - Jet Perforation |
2014-09-01 | Well Fluid changed to Crude Bitumen |
2014-09-01 | Well Type changed to Cyclical |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2005-12-06 | 165.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-01-05 | Slotted Liner | 708.00 | 1922.00 | 0 |
2009-11-28 | Perforation | 1717.10 | 1718.10 | 3 |
2009-11-28 | Perforation | 1725.10 | 1726.10 | 3 |
2009-11-30 | Perforation | 1663.70 | 1664.70 | 3 |
2009-11-30 | Perforation | 1671.70 | 1672.70 | 3 |
2009-11-30 | Perforation | 1609.90 | 1610.90 | 3 |
2009-11-30 | Perforation | 1617.90 | 1618.90 | 3 |
2009-11-30 | Perforation | 1556.30 | 1557.30 | 3 |
2009-11-30 | Perforation | 1564.30 | 1565.30 | 3 |
2009-11-30 | Perforation | 1489.90 | 1490.90 | 3 |
2009-11-30 | Perforation | 1497.90 | 1498.90 | 3 |
2006-01-05 | Open Hole/Barefoot Completion | 1922.00 | 1927.00 | 0 |
2009-11-30 | Perforation | 1423.20 | 1424.20 | 3 |
2009-11-30 | Perforation | 1431.20 | 1432.20 | 3 |
2009-11-30 | Perforation | 1356.30 | 1357.30 | 3 |
2009-11-30 | Perforation | 1364.30 | 1365.30 | 3 |
2009-12-01 | Perforation | 1222.60 | 1223.60 | 3 |
2009-12-01 | Perforation | 1230.60 | 1231.60 | 3 |
2009-12-01 | Perforation | 1062.30 | 1063.30 | 3 |
2009-12-02 | Perforation | 1070.30 | 1071.30 | 3 |
2009-12-02 | Perforation | 1008.90 | 1009.90 | 3 |
2009-12-02 | Perforation | 1016.90 | 1017.90 | 3 |
2008-03-03 | Acid Treatment | 708.00 | 1927.00 | 0 |
2013-07-30 | Packing Device Capped w/Cement | 510.00 | 566.00 | 0 |
2014-08-13 | Perforation | 1016.90 | 1878.60 | 3 |
2009-11-27 | Perforation | 1877.60 | 1878.60 | 3 |
2009-11-27 | Perforation | 1885.60 | 1886.60 | 3 |
2009-11-27 | Perforation | 1824.10 | 1825.10 | 3 |
2009-11-27 | Perforation | 1832.10 | 1833.10 | 3 |
2009-11-28 | Perforation | 1770.60 | 1771.60 | 3 |
2009-11-28 | Perforation | 1778.60 | 1779.60 | 3 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1237 | 0.0 | 0.0 | 0.0 |
2007 | 7454 | 0.0 | 0.0 | 0.0 |
2008 | 6400 | 0.0 | 0.0 | 0.0 |
2009 | 7947 | 0.0 | 0.0 | 0.0 |
2010 | 6416 | 0.0 | 0.0 | 0.0 |
2011 | 8228 | 0.0 | 0.0 | 0.0 |
2012 | 8347 | 0.0 | 0.0 | 0.0 |
2013 | 4908 | 0.0 | 0.0 | 0.0 |
2014 | 2729 | 0.0 | 0.0 | 0.0 |
2015 | 8101 | 0.0 | 0.0 | 0.0 |
2016 | 8706 | 0.0 | 0.0 | 0.0 |
2017 | 8682 | 0.0 | 0.0 | 0.0 |
2018 | 8292 | 0.0 | 0.0 | 0.0 |
2019 | 7283 | 0.0 | 0.0 | 0.0 |
2020 | 1063 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-08-01 | No Incident Encountered | 0.00 | 0.00 |
2014-09-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]