X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041814020

Well Details

Well ID: 0684041814020
Loading map...
Location: 02/14-18-068-04W4/0
Location Alias: 02/14-18-68-04 W4M
Location Alias 2: 02/14-18-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 18
County/Municipality: Improvement District No. 349
Well Name: CNRL 7A53 PRIMROSE 14-18-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319120
License Date: 2004-11-17
License Status: Suspension
Spud Date: 2005-03-26
Final Drill Date: 2005-06-26
Well Total Depth: 2055.00 m
Surface Hole Latitude: 54.886120
Surface Hole Longitude: -110.581184

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-03-26 Surface Casing Operation Performed
2005-06-10 Direction Drilling Operation Performed - Horizontal
2005-06-11 Intermediate Casing Operation Performed
2005-06-11 Well Log Performed
2005-06-26 Finished Drilling
2005-06-26 Well Log Performed
2005-06-26 Well Mode changed to Drilled and Cased
2005-06-27 Liner Casing Operation Performed
2005-06-27 Perforation Treatment Performed - Open-Hole Completion
2005-06-27 Perforation Treatment Performed - Slotted Liner or Casing
2005-06-27 Rig Released
2006-06-20 Well Began Production
2006-06-20 Well Fluid changed to Crude Bitumen
2006-06-20 Well Type changed to Cyclical
2009-10-04 Well Log Performed
2009-10-05 Well Log Performed
2009-10-06 Well Log Performed
2010-03-31 Well Fluid changed to Crude Bitumen
2010-03-31 Well Mode changed to Suspended
2010-03-31 Well Type changed to Cyclical
2011-02-01 Well Fluid changed to Crude Bitumen
2011-02-01 Well Type changed to Cyclical
2011-02-15 Well Log Performed
2016-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-06 Perforation Treatment Performed - Cement Plug
2016-07-07 Perforation Treatment Performed - Cement Plug
2016-09-30 Well Fluid changed to Crude Bitumen
2016-09-30 Well Mode changed to Suspended
2016-09-30 Well Type changed to Cyclical

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-06-10 125.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-06-27 Slotted Liner 831.00 2050.00 0
2005-06-27 Open Hole/Barefoot Completion 2050.00 2055.00 0
2016-07-05 Packing Device Capped w/Cement 300.00 795.00 0
2016-07-06 Cement Plug 200.00 300.00 0
2016-07-07 Cement Plug 60.00 200.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3211 0.0 0.0 0.0
2007 7941 0.0 0.0 0.0
2008 6321 0.0 0.0 0.0
2009 5344 0.0 0.0 0.0
2011 6477 0.0 0.0 0.0
2012 8509 0.0 0.0 0.0
2013 6993 0.0 0.0 0.0
2014 7583 0.0 0.0 0.0
2015 6870 0.0 0.0 0.0
2016 1552 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2006-03-17 No Incident Encountered 0.00 0.00
2016-07-08 No Incident Encountered 0.00 0.00

For data sources see[7]

References