X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041806020

Well Details

Well ID: 0684041806020
Loading map...
Location: 02/06-18-068-04W4/0
Location Alias: 02/06-18-68-04 W4M
Location Alias 2: 02/06-18-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 18
County/Municipality: Improvement District No. 349
Well Name: CNRL 3A53 PRIMROSE 6-18-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319090
License Date: 2004-11-17
License Status: Issued
Spud Date: 2005-03-22
Final Drill Date: 2005-08-24
Well Total Depth: 1928.50 m
Surface Hole Latitude: 54.885354
Surface Hole Longitude: -110.581184

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-03-23 Surface Casing Operation Performed
2005-08-10 Direction Drilling Operation Performed - Deviate
2005-08-11 Direction Drilling Operation Performed - Horizontal
2005-08-11 Well Log Performed
2005-08-12 Intermediate Casing Operation Performed
2005-08-24 Finished Drilling
2005-08-24 Liner Casing Operation Performed
2005-08-24 Well Log Performed
2005-08-24 Well Mode changed to Drilled and Cased
2005-08-25 Perforation Treatment Performed - Open-Hole Completion
2005-08-25 Perforation Treatment Performed - Slotted Liner or Casing
2005-08-25 Rig Released
2006-05-20 Well Began Production
2006-05-20 Well Fluid changed to Crude Bitumen
2006-05-20 Well Type changed to Cyclical
2011-05-20 Perforation Treatment Performed - Jet Perforation
2011-05-21 Perforation Treatment Performed - Jet Perforation
2011-05-22 Perforation Treatment Performed - Jet Perforation
2011-05-23 Perforation Treatment Performed - Jet Perforation
2011-05-24 Perforation Treatment Performed - Jet Perforation
2012-04-26 Perforation Treatment Performed - Jet Perforation
2012-04-27 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-08-10 206.30 Deviate (5 - 79 degrees)
2005-08-11 590.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-25 Slotted Liner 719.00 1923.50 0
2011-05-21 Perforation 1722.50 1723.50 3
2011-05-21 Perforation 1678.10 1679.10 3
2011-05-21 Perforation 1670.10 1671.10 3
2011-05-21 Perforation 1613.30 1614.30 3
2011-05-21 Perforation 1605.30 1606.30 3
2011-05-22 Perforation 1548.00 1549.00 3
2011-05-22 Perforation 1540.00 1541.00 3
2011-05-22 Perforation 1469.90 1470.90 3
2011-05-22 Perforation 1461.90 1462.90 3
2011-05-22 Perforation 1417.40 1418.40 3
2005-08-25 Open Hole/Barefoot Completion 1923.50 1928.50 0
2011-05-22 Perforation 1409.40 1410.40 3
2011-05-22 Perforation 1352.30 1353.30 3
2011-05-22 Perforation 1344.30 1345.30 3
2011-05-23 Perforation 1287.70 1288.70 3
2011-05-23 Perforation 1279.70 1280.70 3
2011-05-23 Perforation 1222.80 1223.80 3
2011-05-23 Perforation 1214.60 1215.60 3
2011-05-23 Perforation 1158.30 1159.30 3
2011-05-23 Perforation 1150.30 1151.30 3
2011-05-23 Perforation 1092.80 1093.80 3
2011-05-20 Perforation 1887.10 1888.10 3
2011-05-23 Perforation 1084.80 1085.80 3
2011-05-23 Perforation 1027.70 1028.70 3
2011-05-23 Perforation 1019.70 1020.70 3
2011-05-23 Perforation 962.40 963.40 3
2011-05-23 Perforation 954.40 955.50 3
2011-05-24 Perforation 897.40 898.40 3
2011-05-24 Perforation 889.40 890.40 3
2011-05-24 Perforation 832.00 833.00 3
2011-05-24 Perforation 824.00 825.00 3
2011-05-24 Perforation 767.10 768.10 3
2011-05-20 Perforation 1879.10 1880.10 3
2011-05-24 Perforation 759.10 760.10 3
2012-04-26 Perforation 1863.80 1864.80 6
2012-04-26 Perforation 1811.80 1812.80 6
2012-04-26 Perforation 1759.70 1760.70 6
2012-04-26 Perforation 1707.30 1708.30 6
2012-04-26 Perforation 1641.90 1642.90 6
2012-04-26 Perforation 1577.10 1578.10 6
2012-04-26 Perforation 1512.00 1513.00 6
2012-04-26 Perforation 1446.70 1447.70 6
2012-04-26 Perforation 1381.30 1382.30 6
2011-05-20 Perforation 1834.80 1835.80 3
2012-04-27 Perforation 1316.80 1317.80 6
2012-04-27 Perforation 1251.70 1252.70 6
2012-04-27 Perforation 1187.50 1188.50 6
2012-04-27 Perforation 1122.10 1123.10 6
2012-04-27 Perforation 1056.60 1057.60 6
2012-04-27 Perforation 991.80 992.80 6
2012-04-27 Perforation 826.30 927.30 6
2012-04-27 Perforation 861.10 862.10 6
2012-04-27 Perforation 796.10 797.10 6
2012-04-27 Perforation 730.90 731.90 6
2011-05-20 Perforation 1826.80 1827.80 3
2011-05-21 Perforation 1782.80 1783.80 3
2011-05-21 Perforation 1774.80 1775.80 3
2011-05-21 Perforation 1730.50 1731.50 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4017 0.0 0.0 0.0
2007 7992 0.0 0.0 0.0
2008 5693 0.0 0.0 0.0
2009 6532 0.0 0.0 0.0
2010 8606 0.0 0.0 0.0
2011 8502 0.0 0.0 0.0
2012 8489 0.0 0.0 0.0
2013 7689 0.0 0.0 0.0
2014 7184 0.0 0.0 0.0
2015 7819 0.0 0.0 0.0
2016 5746 0.0 0.0 0.0
2017 8044 0.0 0.0 0.0
2018 7913 0.0 0.0 0.0
2019 5031 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References