X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041803000

Well Details

Well ID: 0684041803000
Loading map...
Location: 00/03-18-068-04W4/0
Location Alias: 00/03-18-68-04 W4M
Location Alias 2: 00/03-18-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 18
County/Municipality: Improvement District No. 349
Well Name: CNRL 2A53 PRIMROSE 3-18-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319088
License Date: 2004-11-17
License Status: Issued
Spud Date: 2005-03-21
Final Drill Date: 2005-08-18
Well Total Depth: 2054.00 m
Surface Hole Latitude: 54.885264
Surface Hole Longitude: -110.581185

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-03-22 Surface Casing Operation Performed
2005-08-12 Direction Drilling Operation Performed - Deviate
2005-08-13 Direction Drilling Operation Performed - Horizontal
2005-08-13 Well Log Performed
2005-08-14 Intermediate Casing Operation Performed
2005-08-18 Finished Drilling
2005-08-18 Liner Casing Operation Performed
2005-08-18 Well Mode changed to Drilled and Cased
2005-08-19 Perforation Treatment Performed - Open-Hole Completion
2005-08-19 Perforation Treatment Performed - Slotted Liner or Casing
2005-08-19 Rig Released
2005-08-19 Well Log Performed
2006-05-04 Well Began Production
2006-05-04 Well Fluid changed to Crude Bitumen
2006-05-04 Well Type changed to Cyclical
2007-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-04-13 Perforation Treatment Performed - Jet Perforation
2011-04-14 Perforation Treatment Performed - Jet Perforation
2011-04-18 Perforation Treatment Performed - Jet Perforation
2011-04-19 Perforation Treatment Performed - Jet Perforation
2011-04-20 Perforation Treatment Performed - Jet Perforation
2011-04-21 Perforation Treatment Performed - Jet Perforation
2011-04-22 Perforation Treatment Performed - Jet Perforation
2011-04-23 Perforation Treatment Performed - Jet Perforation
2011-04-24 Perforation Treatment Performed - Jet Perforation
2011-04-25 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-08-12 170.00 Deviate (5 - 79 degrees)
2005-08-13 630.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-19 Slotted Liner 821.00 2049.00 0
2011-04-19 Perforation 1869.90 1870.90 3
2011-04-19 Perforation 1861.90 1862.90 3
2011-04-19 Perforation 1817.40 1818.40 3
2011-04-19 Perforation 1809.40 1810.40 3
2011-04-20 Perforation 1765.20 1766.20 3
2011-04-20 Perforation 1757.20 1758.20 3
2011-04-20 Perforation 1721.60 1722.60 3
2011-04-20 Perforation 1713.60 1714.60 3
2011-04-21 Perforation 1661.30 1662.30 3
2011-04-21 Perforation 1653.30 1654.30 3
2005-08-19 Open Hole/Barefoot Completion 2049.00 2054.00 0
2011-04-21 Perforation 1532.50 1533.50 3
2011-04-21 Perforation 1524.50 1525.50 3
2011-04-22 Perforation 1377.60 1378.60 3
2011-04-22 Perforation 1369.80 1370.80 3
2011-04-22 Perforation 1325.20 1326.20 3
2011-04-22 Perforation 1317.20 1318.20 3
2011-04-23 Perforation 1273.30 1274.30 3
2011-04-23 Perforation 1265.30 1266.30 3
2011-04-23 Perforation 1221.40 1222.40 3
2011-04-23 Perforation 1213.40 1214.40 3
2007-01-30 Acid Treatment 821.00 2054.00 0
2011-04-24 Perforation 1169.20 1170.20 3
2011-04-24 Perforation 1161.20 1162.20 3
2011-04-24 Perforation 1116.70 1117.70 3
2011-04-24 Perforation 1108.70 1109.70 3
2011-04-25 Perforation 1064.50 1065.50 3
2011-04-25 Perforation 1056.50 1057.50 3
2011-04-25 Perforation 1012.10 1013.10 3
2011-04-25 Perforation 1004.10 1005.10 3
2011-04-25 Perforation 934.50 935.50 3
2011-04-25 Perforation 926.50 927.50 3
2011-04-13 Perforation 2026.40 2027.40 3
2011-04-13 Perforation 2018.40 2019.40 3
2011-04-14 Perforation 1973.90 1974.90 3
2011-04-14 Perforation 1965.90 1966.90 3
2011-04-18 Perforation 1922.30 1923.30 3
2011-04-18 Perforation 1914.30 1915.30 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4544 0.0 0.0 0.0
2007 7426 0.0 0.0 0.0
2008 7128 0.0 0.0 0.0
2009 6736 0.0 0.0 0.0
2010 8635 0.0 0.0 0.0
2011 8276 0.0 0.0 0.0
2012 8564 0.0 0.0 0.0
2013 6926 0.0 0.0 0.0
2014 8442 0.0 0.0 0.0
2015 8275 0.0 0.0 0.0
2016 5862 0.0 0.0 0.0
2017 8335 0.0 0.0 0.0
2018 8043 0.0 0.0 0.0
2019 7672 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2011-04-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References