X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041709003

Well Details

Well ID: 0684041709003
Loading map...
Location: 00/09-17-068-04W4/3
Location Alias: 00/09-17-68-04 W4M
Location Alias 2: 00/09-17-068-04 W4/03
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 17
County/Municipality: Improvement District No. 349
Well Name: CVE FISHER 9-17-68-4
Operator Name: Cenovus Energy Inc.
License Number: 0264385
License Date: 2001-12-18
License Status: RecCertified
Spud Date: 2002-02-23
Final Drill Date: 2002-02-28
Well Total Depth: 588.00 m
Surface Hole Latitude: 54.889431
Surface Hole Longitude: -110.570360

For data sources see[1][2]

Well History

Date Event
2001-12-18 Obtained License
2002-02-24 Surface Casing Operation Performed
2002-02-28 Finished Drilling
2002-02-28 Well Log Performed
2002-02-28 Well Mode changed to Drilled and Cased
2002-03-01 Production Casing Operation Performed
2002-03-01 Rig Released
2002-03-23 Perforation Treatment Performed - Jet Perforation
2002-03-23 Well Log Performed
2007-02-13 Perforation Treatment Performed - Cement Plug
2007-02-13 Plug Back Performed
2008-03-08 Perforation Treatment Performed - Jet Perforation
2008-03-17 Perforation Treatment Performed - Jet Perforation
2009-02-17 Perforation Treatment Performed - Cement Plug
2009-02-17 Perforation Treatment Performed - Cement Squeeze
2009-02-17 Plug Back Performed
2009-02-17 Well Mode changed to Abandoned Zone
2009-02-25 Well Abandoned
2009-02-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-03-23 Perforation 341.00 345.00 20
2009-02-17 Cement Plug 51.60 351.00 0
2007-02-13 Cement Plug 351.00 588.00 0
2008-03-08 Perforation 232.60 234.20 13
2008-03-17 Perforation 219.50 223.00 13
2009-02-17 Cement Squeeze 341.00 345.00 0
2009-02-17 Cement Plug 51.60 351.00 0
2009-02-17 Cement Squeeze 232.60 234.20 0
2009-02-17 Cement Plug 51.60 351.00 0
2009-02-17 Cement Squeeze 219.50 223.00 0

For data sources see[4]



References