X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041706040

Well Details

Well ID: 0684041706040
Loading map...
Location: 04/06-17-068-04W4/0
Location Alias: 04/06-17-68-04 W4M
Location Alias 2: 04/06-17-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 17
County/Municipality: Improvement District No. 349
Well Name: CNRL 3B53 PRIMROSE 6-17-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319067
License Date: 2004-11-17
License Status: Amended
Spud Date: 2005-04-26
Final Drill Date: 2005-09-02
Well Total Depth: 505.00 m
Surface Hole Latitude: 54.885623
Surface Hole Longitude: -110.580639

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-04-26 Surface Casing Operation Performed
2005-09-01 Direction Drilling Operation Performed - Deviate
2005-09-02 Finished Drilling
2005-09-02 Production Casing Operation Performed
2005-09-02 Rig Released
2005-09-02 Well Log Performed
2005-09-02 Well Mode changed to Drilled and Cased
2006-02-02 Perforation Treatment Performed - Jet Perforation
2006-05-25 Well Began Production
2006-05-25 Well Fluid changed to Crude Bitumen
2006-05-25 Well Type changed to Cyclical
2007-06-18 Well Log Performed
2007-06-20 Well Log Performed
2007-06-21 Well Log Performed
2009-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-08-03 Perforation Treatment Performed - Cement Plug
2009-08-05 Perforation Treatment Performed - Jet Perforation
2009-08-05 Well Log Performed
2009-08-06 Perforation Treatment Performed - Jet Perforation
2009-11-01 Well Log Performed
2010-03-31 Well Fluid changed to Crude Bitumen
2010-03-31 Well Mode changed to Suspended
2010-03-31 Well Type changed to Cyclical
2013-12-01 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-09-01 190.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-02-02 Perforation 497.00 501.00 20
2009-08-02 Packing Device Capped w/Cement 474.00 489.50 0
2009-08-03 Cement Plug 469.80 474.00 0
2009-08-05 Perforation 460.00 463.00 13
2009-08-06 Perforation 440.00 443.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4061 0.0 0.0 0.0
2007 6797 0.0 0.0 0.0
2008 4799 0.0 0.0 0.0
2009 2964 0.0 0.0 0.0

For data sources see[6]

References