X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041703020

Well Details

Well ID: 0684041703020
Loading map...
Location: 02/03-17-068-04W4/0
Location Alias: 02/03-17-68-04 W4M
Location Alias 2: 02/03-17-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 17
County/Municipality: Improvement District No. 349
Well Name: CNRL 2B53 PRIMROSE 3-17-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319094
License Date: 2004-11-17
License Status: Issued
Spud Date: 2005-04-26
Final Drill Date: 2005-08-31
Well Total Depth: 790.00 m
Surface Hole Latitude: 54.885533
Surface Hole Longitude: -110.580639

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-04-26 Surface Casing Operation Performed
2005-08-30 Direction Drilling Operation Performed - Horizontal
2005-08-31 Finished Drilling
2005-08-31 Well Log Performed
2005-08-31 Well Mode changed to Drilled and Cased
2005-09-01 Production Casing Operation Performed
2005-09-01 Rig Released
2005-12-28 Perforation Treatment Performed - Jet Perforation
2005-12-29 Perforation Treatment Performed - Jet Perforation
2006-05-20 Well Began Production
2006-05-20 Well Fluid changed to Crude Bitumen
2006-05-20 Well Type changed to Cyclical
2012-09-26 Well Log Performed
2012-09-27 Well Log Performed
2012-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-03-31 Well Fluid changed to Crude Bitumen
2013-03-31 Well Mode changed to Suspended
2013-03-31 Well Type changed to Cyclical
2014-07-30 Perforation Treatment Performed - Jet Perforation
2014-07-30 Well Log Performed
2014-07-31 Well Log Performed
2014-08-01 Well Fluid changed to Crude Bitumen
2014-08-01 Well Type changed to Cyclical
2016-07-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-07-13 Production Casing Operation Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-08-30 160.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-12-28 Perforation 785.00 789.00 20
2005-12-29 Perforation 696.00 700.00 20
2005-12-29 Perforation 608.00 612.00 20
2012-09-28 Packing Device Capped w/Cement 461.40 602.00 0
2014-07-30 Perforation 608.00 612.00 20
2014-07-30 Perforation 696.00 700.00 20
2014-07-30 Perforation 785.00 789.00 20
2016-07-13 Packing Device Capped w/Cement 540.00 570.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 4162 0.0 0.0 0.0
2007 7876 0.0 0.0 0.0
2008 6680 0.0 0.0 0.0
2009 6994 0.0 0.0 0.0
2010 8753 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 6290 0.0 0.0 0.0
2014 3310 0.0 0.0 0.0
2015 8293 0.0 0.0 0.0
2016 2367 0.0 0.0 0.0
2017 8628 0.0 0.0 0.0
2018 8305 0.0 0.0 0.0
2019 7700 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-01 No Incident Encountered 0.00 0.00
2014-08-03 No Incident Encountered 0.00 0.00
2016-07-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References