X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041611040

Well Details

Well ID: 0684041611040
Loading map...
Location: 04/11-16-068-04W4/0
Location Alias: 04/11-16-68-04 W4M
Location Alias 2: 04/11-16-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: CNRL 20A59 PRIMROSE 11-16-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0401755
License Date: 2008-10-02
License Status: Issued
Spud Date: 2008-11-28
Final Drill Date: 2009-06-02
Well Total Depth: 2445.00 m
Surface Hole Latitude: 54.880512
Surface Hole Longitude: -110.527617

For data sources see[1][2]

Well History

Date Event
2008-10-02 Obtained License
2008-11-29 Surface Casing Operation Performed
2009-01-24 Direction Drilling Operation Performed - Horizontal
2009-01-26 Well Log Performed
2009-01-27 Intermediate Casing Operation Performed
2009-06-02 Finished Drilling
2009-06-02 Well Mode changed to Drilled and Cased
2009-06-03 Liner Casing Operation Performed
2009-06-03 Well Log Performed
2009-06-05 Perforation Treatment Performed - Open-Hole Completion
2009-06-05 Perforation Treatment Performed - Slotted Liner or Casing
2009-06-05 Rig Released
2009-10-26 Well Log Performed
2010-08-09 Well Log Performed
2010-08-11 Well Log Performed
2010-11-01 Well Began Production
2010-11-01 Well Fluid changed to Crude Bitumen
2010-11-01 Well Type changed to Cyclical
2011-03-04 Well Log Performed
2011-03-05 Well Log Performed
2011-10-15 Well Log Performed
2014-07-27 Well Log Performed
2016-03-12 Well Log Performed
2019-04-06 Perforation Treatment Performed - Jet Perforation
2019-04-07 Perforation Treatment Performed - Jet Perforation
2019-04-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-24 125.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-06-05 Slotted Liner 1176.00 2440.00 0
2019-04-07 Perforation 1951.70 1957.70 10
2019-04-07 Perforation 1895.60 1901.60 10
2019-04-07 Perforation 1839.70 1845.70 10
2019-04-07 Perforation 1725.90 1731.90 10
2019-04-07 Perforation 1669.20 1675.20 10
2019-04-07 Perforation 1612.90 1618.90 10
2019-04-07 Perforation 1556.20 1562.20 10
2019-04-08 Perforation 1443.70 1449.70 10
2019-04-08 Perforation 1386.80 1392.80 10
2019-04-08 Perforation 1329.90 1335.90 10
2009-06-05 Open Hole/Barefoot Completion 2440.00 2445.00 0
2019-04-08 Perforation 1218.00 1224.00 10
2019-04-06 Perforation 2401.20 2407.20 10
2019-04-06 Perforation 2344.60 2350.60 10
2019-04-07 Perforation 2289.00 2295.00 10
2019-04-07 Perforation 2233.50 2239.50 10
2019-04-07 Perforation 2122.50 2128.50 10
2019-04-07 Perforation 2065.40 2071.40 10
2019-04-07 Perforation 2008.10 2014.10 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 543 0.0 0.0 0.0
2011 7455 0.0 0.0 0.0
2012 7203 0.0 0.0 0.0
2013 8485 0.0 0.0 0.0
2014 5616 0.0 0.0 0.0
2015 7288 0.0 0.0 0.0
2016 8533 0.0 0.0 0.0
2017 7601 0.0 0.0 0.0
2018 8280 0.0 0.0 0.0
2019 7579 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-04-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References