X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041611030

Well Details

Well ID: 0684041611030
Loading map...
Location: 03/11-16-068-04W4/0
Location Alias: 03/11-16-68-04 W4M
Location Alias 2: 03/11-16-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: CNRL 19A59 PRIMROSE 11-16-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0401754
License Date: 2008-10-02
License Status: Issued
Spud Date: 2008-12-12
Final Drill Date: 2009-05-11
Well Total Depth: 2368.00 m
Surface Hole Latitude: 54.880479
Surface Hole Longitude: -110.528318

For data sources see[1][2]

Well History

Date Event
2008-10-02 Obtained License
2008-12-12 Surface Casing Operation Performed
2009-01-27 Well Log Performed
2009-01-28 Direction Drilling Operation Performed - Horizontal
2009-01-31 Intermediate Casing Operation Performed
2009-01-31 Well Log Performed
2009-05-11 Finished Drilling
2009-05-11 Well Mode changed to Drilled and Cased
2009-05-12 Liner Casing Operation Performed
2009-05-13 Perforation Treatment Performed - Open-Hole Completion
2009-05-13 Perforation Treatment Performed - Slotted Liner or Casing
2009-05-13 Rig Released
2009-10-27 Well Log Performed
2010-11-01 Well Began Production
2010-11-01 Well Fluid changed to Crude Bitumen
2010-11-01 Well Type changed to Cyclical
2011-02-27 Well Log Performed
2011-10-09 Well Log Performed
2012-10-12 Well Log Performed
2012-10-13 Perforation Treatment Performed - Jet Perforation
2012-10-14 Perforation Treatment Performed - Jet Perforation
2018-04-23 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-28 125.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-05-13 Slotted Liner 1095.00 2363.00 0
2012-10-13 Perforation 1908.60 1909.60 3
2012-10-13 Perforation 1852.20 1853.20 3
2012-10-13 Perforation 1795.80 1796.80 3
2012-10-13 Perforation 1739.10 1740.10 3
2012-10-13 Perforation 1683.40 1684.40 3
2012-10-14 Perforation 1627.20 1628.20 3
2012-10-14 Perforation 1571.30 1572.30 3
2012-10-14 Perforation 1515.20 1516.20 3
2012-10-14 Perforation 1459.60 1460.60 3
2012-10-14 Perforation 1403.70 1404.70 3
2009-05-13 Open Hole/Barefoot Completion 2363.00 2368.00 0
2012-10-14 Perforation 1347.40 1348.40 3
2012-10-14 Perforation 1291.50 1292.50 3
2012-10-14 Perforation 1235.70 1236.70 3
2012-10-14 Perforation 1179.90 1180.90 3
2012-10-14 Perforation 1124.20 1125.20 3
2012-10-13 Perforation 2299.00 2300.00 3
2012-10-13 Perforation 2243.20 2244.20 3
2012-10-13 Perforation 2191.20 2192.20 3
2012-10-13 Perforation 2134.80 2135.80 3
2012-10-13 Perforation 2078.10 2079.10 3
2012-10-13 Perforation 2021.40 2022.40 3
2012-10-13 Perforation 1964.90 1965.90 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 543 0.0 0.0 0.0
2011 7258 0.0 0.0 0.0
2012 7136 0.0 0.0 0.0
2013 8696 0.0 0.0 0.0
2014 7440 0.0 0.0 0.0
2015 7105 0.0 0.0 0.0
2016 8601 0.0 0.0 0.0
2017 4150 0.0 0.0 0.0
2018 3784 0.0 0.0 0.0
2019 57 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References