X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041606000

Well Details

Well ID: 0684041606000
Loading map...
Location: 00/06-16-068-04W4/0
Location Alias: 00/06-16-68-04 W4M
Location Alias 2: 00/06-16-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: CNRL 4C53 PRIMROSE 6-16-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0319084
License Date: 2004-11-17
License Status: Issued
Spud Date: 2005-05-06
Final Drill Date: 2005-08-06
Well Total Depth: 1880.00 m
Surface Hole Latitude: 54.885376
Surface Hole Longitude: -110.580639

For data sources see[1][2]

Well History

Date Event
2004-11-17 Obtained License
2005-05-07 Surface Casing Operation Performed
2005-07-20 Direction Drilling Operation Performed - Horizontal
2005-07-20 Well Log Performed
2005-07-21 Intermediate Casing Operation Performed
2005-08-06 Finished Drilling
2005-08-06 Well Log Performed
2005-08-06 Well Mode changed to Drilled and Cased
2005-08-07 Liner Casing Operation Performed
2005-08-07 Perforation Treatment Performed - Open-Hole Completion
2005-08-07 Perforation Treatment Performed - Slotted Liner or Casing
2005-08-07 Rig Released
2006-05-25 Well Began Production
2006-05-25 Well Fluid changed to Crude Bitumen
2006-05-25 Well Type changed to Cyclical
2009-05-25 Perforation Treatment Performed - Jet Perforation
2009-05-26 Perforation Treatment Performed - Jet Perforation
2009-05-27 Perforation Treatment Performed - Jet Perforation
2009-05-28 Perforation Treatment Performed - Jet Perforation
2009-05-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-07-20 251.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-07 Slotted Liner 645.00 1875.00 0
2009-05-26 Perforation 1646.40 1647.40 2
2009-05-26 Perforation 1620.10 1621.10 2
2009-05-26 Perforation 1607.30 1608.30 2
2009-05-26 Perforation 1594.40 1595.40 2
2009-05-26 Perforation 1581.50 1582.50 2
2009-05-26 Perforation 1554.90 1555.90 2
2009-05-26 Perforation 1542.00 1543.00 2
2009-05-26 Perforation 1529.10 1530.10 2
2009-05-26 Perforation 1516.20 1517.20 2
2009-05-26 Perforation 1489.70 1490.70 2
2005-08-07 Open Hole/Barefoot Completion 1875.00 1880.00 0
2009-05-26 Perforation 1478.50 1479.50 2
2009-05-27 Perforation 1476.90 1477.90 2
2009-05-27 Perforation 1464.00 1465.00 2
2009-05-27 Perforation 1451.10 1452.10 2
2009-05-27 Perforation 1424.50 1425.50 2
2009-05-27 Perforation 1411.70 1412.70 2
2009-05-27 Perforation 1398.80 1399.80 2
2009-05-27 Perforation 1385.90 1386.90 2
2009-05-27 Perforation 1359.30 1360.30 2
2009-05-27 Perforation 1346.40 1347.40 2
2009-05-25 Perforation 1750.20 1751.20 2
2009-05-27 Perforation 1333.50 1334.50 2
2009-05-28 Perforation 1320.70 1321.70 2
2009-05-28 Perforation 1294.40 1295.40 2
2009-05-28 Perforation 1281.50 1282.50 2
2009-05-28 Perforation 1268.40 1269.40 2
2009-05-28 Perforation 1255.40 1256.40 2
2009-05-28 Perforation 1228.70 1229.70 2
2009-05-28 Perforation 1215.90 1216.90 2
2009-05-28 Perforation 1203.40 1204.40 2
2009-05-28 Perforation 1190.90 1191.90 2
2009-05-25 Perforation 1737.40 1738.40 2
2009-05-28 Perforation 1164.60 1165.60 2
2009-05-28 Perforation 1151.70 1152.70 2
2009-05-28 Perforation 1138.80 1139.80 2
2009-05-28 Perforation 1125.90 1126.90 2
2009-05-28 Perforation 1099.40 1100.40 2
2009-05-28 Perforation 1086.40 1087.40 2
2009-05-28 Perforation 1073.30 1074.30 2
2009-05-28 Perforation 1060.30 1061.30 2
2009-05-28 Perforation 1033.60 1034.60 2
2009-05-28 Perforation 1020.80 1021.80 2
2009-05-25 Perforation 1724.50 1725.50 2
2009-05-28 Perforation 1007.90 1008.90 2
2009-05-28 Perforation 995.00 996.00 2
2009-05-28 Perforation 968.40 969.40 2
2009-05-28 Perforation 955.40 956.40 2
2009-05-28 Perforation 942.50 943.50 2
2009-05-28 Perforation 929.60 930.60 2
2009-05-28 Perforation 903.10 904.10 2
2009-05-28 Perforation 890.20 891.20 2
2009-05-28 Perforation 877.40 878.40 2
2009-05-30 Perforation 864.50 865.50 2
2009-05-25 Perforation 1711.60 1712.60 2
2009-05-30 Perforation 838.00 839.00 2
2009-05-30 Perforation 825.20 826.20 2
2009-05-30 Perforation 812.20 813.20 2
2009-05-30 Perforation 799.30 800.30 2
2009-05-30 Perforation 772.90 773.90 2
2009-05-30 Perforation 759.90 760.90 2
2009-05-30 Perforation 746.90 747.90 2
2009-05-30 Perforation 734.50 735.50 2
2009-05-30 Perforation 707.60 708.60 2
2009-05-30 Perforation 694.80 695.80 2
2009-05-25 Perforation 1685.10 1686.10 2
2009-05-30 Perforation 682.10 683.10 2
2009-05-30 Perforation 669.10 670.10 2
2009-05-25 Perforation 1672.10 1673.10 2
2009-05-26 Perforation 1659.20 1660.20 2

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 3924 0.0 0.0 0.0
2007 7685 0.0 0.0 0.0
2008 6150 0.0 0.0 0.0
2009 6488 0.0 0.0 0.0
2010 8461 0.0 0.0 0.0
2011 8752 0.0 0.0 0.0
2012 8587 0.0 0.0 0.0
2013 7905 0.0 0.0 0.0
2014 8224 0.0 0.0 0.0
2015 8273 0.0 0.0 0.0
2016 5991 0.0 0.0 0.0
2017 8352 0.0 0.0 0.0
2018 6398 0.0 0.0 0.0
2019 7700 0.0 0.0 0.0
2020 513 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-06-06 No Incident Encountered 0.00 0.00
2009-06-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References