X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041603030

Well Details

Well ID: 0684041603030
Loading map...
Location: 03/03-16-068-04W4/0
Location Alias: 03/03-16-68-04 W4M
Location Alias 2: 03/03-16-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 16
County/Municipality: Improvement District No. 349
Well Name: CNRL 9A59 PRIMROSE 3-16-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0401744
License Date: 2008-10-02
License Status: Issued
Spud Date: 2008-12-08
Final Drill Date: 2009-04-24
Well Total Depth: 1960.00 m
Surface Hole Latitude: 54.880098
Surface Hole Longitude: -110.528318

For data sources see[1][2]

Well History

Date Event
2008-10-02 Obtained License
2008-12-09 Surface Casing Operation Performed
2009-02-11 Direction Drilling Operation Performed - Horizontal
2009-02-13 Intermediate Casing Operation Performed
2009-02-13 Well Log Performed
2009-04-24 Finished Drilling
2009-04-24 Liner Casing Operation Performed
2009-04-24 Well Log Performed
2009-04-24 Well Mode changed to Drilled and Cased
2009-04-25 Perforation Treatment Performed - Open-Hole Completion
2009-04-25 Perforation Treatment Performed - Slotted Liner or Casing
2009-04-25 Rig Released
2009-10-28 Well Log Performed
2010-10-01 Well Began Production
2010-10-01 Well Fluid changed to Crude Bitumen
2010-10-01 Well Type changed to Cyclical
2011-08-31 Well Log Performed
2012-09-24 Well Log Performed
2012-09-28 Well Log Performed
2012-09-29 Perforation Treatment Performed - Jet Perforation
2012-09-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-11 125.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-04-25 Slotted Liner 693.00 1956.00 0
2012-09-29 Perforation 1498.40 1499.40 3
2012-09-29 Perforation 1385.70 1386.70 3
2012-09-30 Perforation 1329.50 1330.50 3
2012-09-30 Perforation 1272.70 1273.70 3
2012-09-30 Perforation 1216.10 1217.10 3
2012-09-30 Perforation 1160.10 1161.10 3
2012-09-30 Perforation 1103.40 1104.40 3
2012-09-30 Perforation 1046.50 1047.50 3
2012-09-30 Perforation 990.90 991.90 3
2012-09-30 Perforation 934.30 935.30 3
2009-04-25 Open Hole/Barefoot Completion 1956.00 1960.00 0
2012-09-30 Perforation 877.60 878.60 3
2012-09-30 Perforation 821.60 822.60 3
2012-09-30 Perforation 764.80 765.80 3
2012-09-30 Perforation 708.40 709.40 3
2012-09-29 Perforation 1891.70 1892.70 3
2012-09-29 Perforation 1836.40 1837.40 3
2012-09-29 Perforation 1779.80 1780.80 3
2012-09-29 Perforation 1724.30 1725.30 3
2012-09-29 Perforation 1667.70 1668.70 3
2012-09-29 Perforation 1611.00 1612.00 3
2012-09-29 Perforation 1555.40 1556.40 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 927 0.0 0.0 0.0
2011 6333 0.0 0.0 0.0
2012 7064 0.0 0.0 0.0
2013 8580 0.0 0.0 0.0
2014 6256 0.0 0.0 0.0
2015 6597 0.0 0.0 0.0
2016 7922 0.0 0.0 0.0
2017 1121 0.0 0.0 0.0
2018 4569 0.0 0.0 0.0
2019 1108 0.0 0.0 0.0
2020 673 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-01 No Incident Encountered 0.00 0.00

For data sources see[7]

References