X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041405000

Well Details

Well ID: 0684041405000
Loading map...
Location: 00/05-14-068-04W4/0
Location Alias: 00/05-14-68-04 W4M
Location Alias 2: 00/05-14-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 14
County/Municipality: Improvement District No. 349
Well Name: CNRL 14A63 PRIMROSE 5-14-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0409743
License Date: 2009-03-16
License Status: Issued
Spud Date: 2009-05-06
Final Drill Date: 2009-08-08
Well Total Depth: 2002.00 m
Surface Hole Latitude: 54.880108
Surface Hole Longitude: -110.536099

For data sources see[1][2]

Well History

Date Event
2009-03-16 Obtained License
2009-05-07 Surface Casing Operation Performed
2009-07-22 Direction Drilling Operation Performed - Horizontal
2009-07-24 Intermediate Casing Operation Performed
2009-07-24 Well Log Performed
2009-08-08 Finished Drilling
2009-08-08 Well Mode changed to Drilled and Cased
2009-08-09 Liner Casing Operation Performed
2009-08-09 Perforation Treatment Performed - Open-Hole Completion
2009-08-09 Perforation Treatment Performed - Slotted Liner or Casing
2009-08-09 Rig Released
2009-08-09 Well Log Performed
2009-11-23 Well Log Performed
2010-10-01 Well Began Production
2010-10-01 Well Fluid changed to Crude Bitumen
2010-10-01 Well Type changed to Cyclical
2012-09-24 Well Log Performed
2012-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-09-30 Well Log Performed
2013-03-31 Well Fluid changed to Crude Bitumen
2013-03-31 Well Mode changed to Suspended
2013-03-31 Well Type changed to Cyclical
2013-10-11 Perforation Treatment Performed - Cement Plug
2014-09-07 Well Log Performed
2014-09-08 Well Log Performed
2014-09-12 Well Log Performed
2014-12-01 Well Type changed to Observation
2015-01-27 Perforation Treatment Performed - Cement Plug

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-07-22 125.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-08-09 Slotted Liner 807.00 1992.00 0
2009-08-09 Open Hole/Barefoot Completion 1992.00 2002.00 0
2012-09-28 Packing Device Capped w/Cement 435.00 544.00 0
2013-10-11 Cement Plug 112.20 435.00 0
2015-01-27 Cement Plug 0.00 545.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 680 0.0 0.0 0.0
2011 6787 0.0 0.0 0.0
2012 3547 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-13 No Incident Encountered 0.00 0.00
2015-01-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References