X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041006090

Well Details

Well ID: 0684041006090
Loading map...
Location: 09/06-10-068-04W4/0
Location Alias: 09/06-10-68-04 W4M
Location Alias 2: 09/06-10-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 10
County/Municipality: Improvement District No. 349
Well Name: CNRL 17A62 PRIMROSE 6-10-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0402538
License Date: 2008-10-21
License Status: Issued
Spud Date: 2008-10-24
Final Drill Date: 2009-04-19
Well Total Depth: 2303.00 m
Surface Hole Latitude: 54.865853
Surface Hole Longitude: -110.506858

For data sources see[1][2]

Well History

Date Event
2008-10-21 Obtained License
2008-10-25 Surface Casing Operation Performed
2009-04-09 Direction Drilling Operation Performed - Horizontal
2009-04-11 Well Log Performed
2009-04-12 Intermediate Casing Operation Performed
2009-04-19 Finished Drilling
2009-04-19 Well Mode changed to Drilled and Cased
2009-04-20 Liner Casing Operation Performed
2009-04-20 Perforation Treatment Performed - Open-Hole Completion
2009-04-20 Perforation Treatment Performed - Slotted Liner or Casing
2009-04-20 Rig Released
2009-04-20 Well Log Performed
2009-07-19 Well Log Performed
2010-02-01 Well Began Production
2010-02-01 Well Fluid changed to Crude Bitumen
2010-02-01 Well Type changed to Cyclical
2011-07-20 Well Log Performed
2012-06-28 Well Log Performed
2012-06-29 Well Log Performed
2014-05-18 Perforation Treatment Performed - Jet Perforation
2014-05-19 Perforation Treatment Performed - Jet Perforation
2018-02-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-04-09 125.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-04-20 Slotted Liner 1025.00 2293.00 0
2014-05-18 Perforation 2215.10 2216.10 6
2014-05-18 Perforation 2257.30 2258.30 6
2014-05-19 Perforation 1124.80 1125.80 6
2014-05-19 Perforation 1180.70 1181.70 6
2014-05-19 Perforation 1236.20 1237.20 6
2014-05-19 Perforation 1333.20 1334.20 6
2014-05-19 Perforation 1403.60 1404.60 6
2014-05-19 Perforation 1458.70 1459.70 6
2014-05-19 Perforation 1556.70 1557.70 6
2014-05-19 Perforation 1612.60 1613.60 6
2009-04-20 Open Hole/Barefoot Completion 2293.00 2303.00 0
2014-05-19 Perforation 1667.80 1668.80 6
2014-05-19 Perforation 1737.90 1738.90 6
2014-05-18 Perforation 1822.60 1823.60 6
2014-05-18 Perforation 1878.40 1879.40 6
2014-05-18 Perforation 1933.80 1934.80 6
2014-05-18 Perforation 1989.60 1990.60 6
2014-05-18 Perforation 2046.20 2047.20 6
2014-05-18 Perforation 2102.70 2103.70 6
2014-05-18 Perforation 2172.70 2173.70 6

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5811 0.0 0.0 0.0
2011 5706 0.0 0.0 0.0
2012 7963 0.0 0.0 0.0
2013 7103 0.0 0.0 0.0
2014 7738 0.0 0.0 0.0
2015 7492 0.0 0.0 0.0
2016 7741 0.0 0.0 0.0
2017 5030 0.0 0.0 0.0
2018 1904 0.0 0.0 0.0
2019 2098 0.0 0.0 0.0
2020 1429 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-05-21 No Incident Encountered 0.00 0.00

For data sources see[7]

References