X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0684041006030

Well Details

Well ID: 0684041006030
Loading map...
Location: 03/06-10-068-04W4/0
Location Alias: 03/06-10-68-04 W4M
Location Alias 2: 03/06-10-068-04 W4/00
Country: Canada
Province: Alberta
Township: 068
Meridian: 4
Range: 04
Section: 10
County/Municipality: Improvement District No. 349
Well Name: CNRL 17A58 PRIMROSE 6-10-68-4
Operator Name: Canadian Natural Resources Limited
License Number: 0396763
License Date: 2008-05-22
License Status: Issued
Spud Date: 2008-06-21
Final Drill Date: 2008-09-22
Well Total Depth: 2221.00 m
Surface Hole Latitude: 54.865945
Surface Hole Longitude: -110.556973

For data sources see[1][2]

Well History

Date Event
2008-05-22 Obtained License
2008-06-09 Well Log Performed
2008-06-21 Surface Casing Operation Performed
2008-07-15 Direction Drilling Operation Performed - Horizontal
2008-07-19 Intermediate Casing Operation Performed
2008-07-26 Well Log Performed
2008-09-22 Finished Drilling
2008-09-22 Well Mode changed to Drilled and Cased
2008-09-23 Liner Casing Operation Performed
2008-09-23 Perforation Treatment Performed - Open-Hole Completion
2008-09-23 Perforation Treatment Performed - Slotted Liner or Casing
2008-09-23 Rig Released
2008-09-23 Well Log Performed
2009-01-17 Well Log Performed
2010-02-01 Well Began Production
2010-02-01 Well Fluid changed to Crude Bitumen
2010-02-01 Well Type changed to Cyclical
2011-07-03 Well Log Performed
2013-01-14 Perforation Treatment Performed - Jet Perforation
2013-01-15 Perforation Treatment Performed - Jet Perforation
2018-07-15 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-07-15 123.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-23 Slotted Liner 944.00 2211.00 0
2013-01-14 Perforation 1781.70 1782.70 3
2013-01-14 Perforation 1729.20 1730.20 3
2013-01-14 Perforation 1676.60 1677.60 3
2013-01-14 Perforation 1623.90 1624.90 3
2013-01-15 Perforation 1570.30 1571.30 3
2013-01-15 Perforation 1516.30 1517.30 3
2013-01-15 Perforation 1463.70 1464.70 3
2013-01-15 Perforation 1410.90 1411.90 3
2013-01-15 Perforation 1358.00 1359.00 3
2013-01-15 Perforation 1304.70 1305.70 3
2008-09-23 Open Hole/Barefoot Completion 2211.00 2221.00 0
2013-01-15 Perforation 1252.50 1253.50 3
2013-01-15 Perforation 1200.20 1201.20 3
2013-01-15 Perforation 1147.50 1148.50 3
2013-01-15 Perforation 1094.70 1095.70 3
2013-01-15 Perforation 1041.30 1042.30 3
2013-01-15 Perforation 989.20 990.20 3
2013-01-14 Perforation 2164.10 2165.10 3
2013-01-14 Perforation 2111.50 2112.50 3
2013-01-14 Perforation 2058.30 2059.30 3
2013-01-14 Perforation 2006.00 2007.00 3
2013-01-14 Perforation 1940.00 1941.00 3
2013-01-14 Perforation 1887.00 1888.00 3
2013-01-14 Perforation 1834.00 1835.00 3

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 5874 0.0 0.0 0.0
2011 5764 0.0 0.0 0.0
2012 8694 0.0 0.0 0.0
2013 7398 0.0 0.0 0.0
2014 8583 0.0 0.0 0.0
2015 7252 0.0 0.0 0.0
2016 7761 0.0 0.0 0.0
2017 2600 0.0 0.0 0.0
2018 6265 0.0 0.0 0.0
2019 649 0.0 0.0 0.0
2020 673 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-17 No Incident Encountered 0.00 0.00

For data sources see[7]

References